O24 S9.1 Roads and stormwater drainage RO24 Not Applicable.
Roads and stormwater drainage infrastructure is infrastructure is constructed in accordance with—
constructed— a) Sections 2, 3 and 4 of PSP5 Engineering
a) in accordance with appropriate engineering Design Standards – Roads, Drainage and
standards; and Earthworks;
b) to minimise adverse environmental impacts, b) Queensland Design Code for Residential
including from run-off and erosion. Streets;
c) AUSTROADS; or
d) A combination of the principles in these
documents;
AND
S9.2 Erosion and sediment control measures are
designed and implemented in accordance with
the Institution of Engineers Australia
(Queensland Division) Soil Erosion and Sediment
Control - Guidelines for Queensland Construction
Sites.
Environmental Protection S10.1 Roads and stormwater drainage follow RO25 Not Applicable.
O25 the edge of existing disturbed areas, or
Roads and stormwater drainage infrastructure are alternatively, these works are co-located within
located and aligned so as to— a combined utility corridor;
a) minimise disturbance to native vegetation AND
and/or other habitat areas; S10.2 Roads avoid native vegetation and
b) protect and maintain wildlife corridor provide for fauna underpasses and associated
movements and the safety of native fauna; fencing where appropriate;
c) minimise changes to the hydrological regime, AND
including drainage patterns, run-off and water S10.3 Road infrastructure within or adjacent to
quality; native habitat incorporates fences which allow
d) avoid crossing watercourses, drainage lines and for protected wildlife movement and controls
wetlands, but where such crossings are unrestricted access of domestic cats and dogs;
unavoidable, disturbed areas are reinstated and AND
revegetated on completion of works; and S10.4 Native vegetation is protected from
e) minimise bulk earthworks. clearing or construction activities by—
a) clearly marking vegetation to be
retained with flagging tap;
b) installing protective fencing around the
dripline of vegetation; and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Services Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.