Council archive · source document
Engineering Services Assessment · MCU15/0122
Attached to the e-mail MCU15/0122 Development Application - Engineering Services Assessment Email 5 of 5.
Very large file (10.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 36, section 1. The text section number identifies this passage in the reader.
c) ensuring stock piling, storage and vehicle
parking occur outside the areas of vegetation to
be retained;
AND
S10.5 Low impact construction techniques are
used around areas of vegetation to be retained
to minimise interference with the vegetation.
O26 No solution provided RO26 Not Applicable.
Roads and stormwater drainage infrastructure is
proven to be suitable for its use prior to Council
accepting the dedicated asset.
O27 S12.1 The location, design and construction of RO27 Not Applicable.
Alignment of stormwater drainage infrastructure is to stormwater drainage structures is in accordance
allow for easy access for the ongoing maintenance by with Sections 4 and 5 of PSP5, Engineering
Council. Design Standards - Roads, Drainage and
Earthworks;
AND
S12.2 Where infrastructure is located on private
land an easement is dedicated over the
infrastructure in accordance with Section 4 of
PSP 5, Engineering Design Standards – Roads,
Drainage and Earthworks.
O28 S13.1 The following infrastructure components RO28 The existing road frontages are complete with
Development is provided with external roadworks already exist at the frontage of the site or are kerb and channel and underground utilities.
along the full extent of the frontage of the site to an provided at the developer’s Any works within the road verges fronting the
appropriate standard having regard to the specified expense— site will be in line with Noosa Council
function of the road. a) full width sealed road; Standards.
b) concrete kerb and channel where appropriate;
c) forming and grading to footpaths;
d) vehicular kerb and footpath crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed carriageway;
h) required alterations to public utility mains,
services or installations;
i) construction of any required alterations to
public utility mains, services or installations;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Services Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.