Attachment E - Stormwater Management Report · MCU24/0112
Very large file (21.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Figure 2 - MUSIC layout for development
The developed site treatment train effectiveness is outlined in Table 2.
Table 2 - Treatment train effectiveness.
Modelled Parameters Source nodes Residual load % Reduction
Flow (ML/yr) 3.04 3.04 0
Total Suspended Solids (kg/yr) 413 80.2 80.6
Total Phosphorus (kg/yr) 0.894 0.268 70
Total Nitrogen (kg/yr) 6.31 2.79 55.8
Gross Pollutants (kg/yr) 70.7 1.07 98.5
Based on the MUSIC modelling results in Table 2 above, the proposed treatment train achieves the
required pollutant load reduction objectives for all pollutants. The proposed proprietary treatment
measures are therefore considered adequate for the development. Further review and refinement of
the water quality treatment measures should be undertaken at the detailed design phase.
4. 3 Con st ruc t io n Ph a se
Management of stormwater runoff during construction and the implementation of an erosion & sediment
control program is necessary to avoid impacts to receiving waters from pollutants typically generated
during the construction phase. Typical pollutants are described in Table 3 below:
Table 3 – Pollutants Typically Generated During the Construction Phase
Pollutant Sources
Litter (Gross Pollutants) Paper, construction packaging, food packaging, cement bags.
Sediment Unprotected exposed soils and stockpiles during earthworks and building.
Hydrocarbons Fuel and oil spills, leaks from construction equipment.
Toxic materials Cement slurry, asphalt prime, solvents, cleaning agents, wash waters.
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment E - Stormwater Management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 21.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.