Response:
The originally submitted vehicle swept path analysis drawings prepared by TTM have been updated
and are presented in Appendix B of the traffic report. These drawings demonstrate that all aspects
of proposed development layout adequately accommodate the relevant design vehicles access,
circulation and manoeuvring.
Item 10:
There will be a demand for customers to use both centres in the same trip and for this reason there
should be integration between the two buildings for cars, pedestrians and service vehicles.
Provide amended plans that address and provide for the following:
a) Redesign the proposal to integrate the vehicular access arrangements (car and service
vehicle) and pedestrian connectivity of the proposed Bunnings expansion with the existing
Bunnings development.
b) Demonstrate how vehicles would safely and appropriately exit the existing northern Bunnings
access driveway and then enter the proposed new Bunnings expansion driveway.
c) Quantify and justify the loss of on-street parking arising from the proposed access
arrangements.
d) Demonstrate that a delivery vehicle entering the new driveway will have adequate height
clearance where it passes under the new building.
e) Justify one-way operation of the proposed basement carpark when the preferred two-way
operation can be readily accommodated.
Response:
a) Integration of the two sites is not physically possible due to the substantial level difference
between the two sites being approximately 3m.
It is acknowledged that there may be some shared trips between the existing Bunnings
warehouse site and the proposed development, however anecdotally, perhaps in the order of
20-30% of trips to the proposed development would also attend the existing development. This
equates to around 2-3 trips during the weekday peak hour periods and 3-5 trips during the
weekend peak hours.
b) TTM drawing number 21BRT0226-04B (Appendix B of the traffic report) demonstrates that the
design customer vehicle (large car and dual-axle trailer combination) can safely and adequately
exit the existing Bunnings northern access on Gateway Drive, enter the central right turn lane
standing clear of both southbound and northbound through lanes, and enter the proposed
southern access for the development site. Importantly, the analysis of the right turn lane
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Traffic Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.