Council archive · source document
Attachment D - Traffic Response · MCU22/0051
Very large file (15.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
indicates that the design queue length in all assessed peak hour periods is up to one vehicle
length.
c) The proposed upgrade works on Gateway Drive, including extension of the existing right turn
lane, results in a reduction in existing on-street car parking capacity of 8 cars lengths including 4
car lengths on each side of the road. The implementation of the proposed ‘no stopping’ zones is
necessary for the safe and efficient operation of traffic flows along this section of Gateway Drive.
Importantly, it is relevant to note that any development over the subject site would necessitate
a similar reduction in on-street car parking availability to achieve site access provisions and
retain the safety and efficiency of Gateway Drive.
d) The upper level building footprint has been revised to ensure full height clearance availability for
delivery vehicle movements.
e) One-way traffic flow within the lower level car parking area is an ideal arrangement in terms of
traffic flow efficiency and minimising potential conflicts with circulating vehicles and parking
manoeuvres.
Issue 11:
It is noted that traffic generation rates in the traffic report use 50% of the traffic generation rates
associated with the existing Bunnings. Provide a revised traffic assessment based on traffic
generation rates and distribution derived from the traffic generation of the existing bunnings
development (from the existing counts at the Bunnings access driveways included in the TTM report),
and include assessment of impacts at the Gateway Drive / Rene St / Eumundi Noosa Road
roundabout.
Response:
Application of the surveyed generation rates of the existing Bunnings retail warehouse development
is not appropriate for the proposed development. This is because traffic generation associated with
the two differing components is vastly different. This is evidenced by traffic generation surveys
undertaken by TTM of the bulk trade component of the existing Bunnings in Keperra QLD which, as
detailed in Section 7.4.1 of the traffic report, has relatively low generation rates when compared to
the overall traffic generation of a retail warehouse development. The survey results referred to are
attached to this letter for information purposes.
As addressed in Section 7.6 of the traffic report the proposed development will result in insignificant
increases in peak hour traffic demands at the Eumundi Noosa Rd / Gateway Dr roundabout
intersection which do not warrant detailed operational performance analysis of the intersection.
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Traffic Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.