Skip to the record
For the highest quality transcripts.

Council archive · source document

Attachment D - Traffic Response · MCU22/0051

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

           indicates that the design queue length in all assessed peak hour periods is up to one vehicle
           length.
        c) The proposed upgrade works on Gateway Drive, including extension of the existing right turn
           lane, results in a reduction in existing on-street car parking capacity of 8 cars lengths including 4
           car lengths on each side of the road. The implementation of the proposed ‘no stopping’ zones is
           necessary for the safe and efficient operation of traffic flows along this section of Gateway Drive.

            Importantly, it is relevant to note that any development over the subject site would necessitate
            a similar reduction in on-street car parking availability to achieve site access provisions and
            retain the safety and efficiency of Gateway Drive.

        d) The upper level building footprint has been revised to ensure full height clearance availability for
           delivery vehicle movements.
        e) One-way traffic flow within the lower level car parking area is an ideal arrangement in terms of
           traffic flow efficiency and minimising potential conflicts with circulating vehicles and parking
           manoeuvres.

Issue 11:

        It is noted that traffic generation rates in the traffic report use 50% of the traffic generation rates
        associated with the existing Bunnings. Provide a revised traffic assessment based on traffic
        generation rates and distribution derived from the traffic generation of the existing bunnings
        development (from the existing counts at the Bunnings access driveways included in the TTM report),
        and include assessment of impacts at the Gateway Drive / Rene St / Eumundi Noosa Road
        roundabout.

        Response:

        Application of the surveyed generation rates of the existing Bunnings retail warehouse development
        is not appropriate for the proposed development. This is because traffic generation associated with
        the two differing components is vastly different. This is evidenced by traffic generation surveys
        undertaken by TTM of the bulk trade component of the existing Bunnings in Keperra QLD which, as
        detailed in Section 7.4.1 of the traffic report, has relatively low generation rates when compared to
        the overall traffic generation of a retail warehouse development. The survey results referred to are
        attached to this letter for information purposes.

        As addressed in Section 7.6 of the traffic report the proposed development will result in insignificant
        increases in peak hour traffic demands at the Eumundi Noosa Rd / Gateway Dr roundabout
        intersection which do not warrant detailed operational performance analysis of the intersection.




                                                                                                               3

Used in these records

About this file

File size
15.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment D - Traffic Response.pdf · 15.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.