Council archive · source document
Attachment D - Traffic Response · MCU22/0051
Very large file (15.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 71, section 1. The text section number identifies this passage in the reader.
Performance outcomes Acceptable Outcomes Response
2. be easily maintained;
3. have a width and longitudinal gradient to
cater for projected usage;
4. provide clear sight-lines for safe use; and
5. be free of any obstructions such as
fences, signage and bollards
AO9.8
Pedestrian routes border the frontages of residential
land, public parks and business uses with routes through
parking lots or at the rear of lots avoided.
Road Design and Construction Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes Response
Road Design and Construction
PO10 AO10 Complies with PO and AO
Roads and pathways are planned and designed to Road planning and design is in accordance with Council’s A minor upgrade to pavement marking along the
support the function of the road hierarchy and ensure Planning Scheme Policy PSP6 Engineering Design site’s frontage to Gateway Drive is required. Refer
that— Standards – Roads, drainage and earthworks. to TTM’s Traffic Engineering Report for details.
1. design and alignment of roads,
intersections and all associated works—
1. convey the primary
function of each type of
street;
2. provide a safe
environment for all users;
3. are adequate for the
design speed
environment;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Traffic Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.