Council archive · source document
Attachment D - Traffic Response · MCU22/0051
Very large file (15.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 72, section 1. The text section number identifies this passage in the reader.
Performance outcomes Acceptable Outcomes Response
4.are adequate for
predicted traffic volumes;
5. maintains the safe and
efficient functioning of
the road network
incorporating
roundabouts as a
preference to T
intersections;
6. are compatible with
existing infrastructure;
7. are easily maintained by
Council equipment; and
8. where appropriate, have
the ability to
accommodate public
transport services;
2. road pavement surfaces—
1. are durable enough to
carry estimated wheel
loads of travelling and
parked vehicles;
2. provide for the safe
passage of vehicles,
pedestrians, cyclists, and
discharge of stormwater
run-off from contributing
catchments and the
preservation of all-
weather access;
3. kerb and channel—
1. controls vehicle
movement by delineating
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Traffic Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.