Original source · versioned page text
NON-POWERED WATER SPORTS FEASIBILTY STUDY · Attachment 1: Noosa NPWS Feasibility Study
Very large file (23.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Sport & Recreation Landscape
Planning by: Architecture by:
LEGEND
NOOSA RIVER SLIPWAY NOOSA YACHT & ROWING
CLUB (NYRC)
Property boundaries
04
Commercial lease areas
15 03
05
07
14 01
08 12 PIRATE
PLAYGROUND
08
06 09
CHAPLAIN PARK 11 QUOTA PARK
02
10
13
REET
E
Project details:
C
A
R
R
TE
MILL ST
NOOSA NON-POWERED WATER
IE
P
YM
CRAFT PRECINCT INDICATIVE
G
SITE LAYOUT*
Noosaville QLD 4566
Disclaimer: This master plan is conceptual and indicative of potential outcomes only and is subject to further design development, approvals and funding. This plan is not intended for construction purposes.
*Subject to further planning consideration
NOTES
Scale: 1:1500 at A3
01. Existing Clubhouse retained with minor modifications made 07. Boardwalk to destination viewing point overlooking Noosa NOTE: If the primary amenities block was to be redeveloped or
within existing footprint. River. relocated in future years, consider storage for OC6 Outriggers in
this location. Date: 17 August 2023
02. Boat storage and parking are included within NYRC tenure. 08. Retain loading bays to service NYRC.
12. Redesign car park for optimum traffic movement and parking
03. Reclaim the water’s edge as public open space. This area is 09. Relocate rowing racks slightly south.
provision, including disability parking bays and drop off zones. Issue: Final (B)
for public use and not for the storage of vessels.
10. Covered storage area (with chain mesh sides) for housing the
13. Protect and expand mangroves.
04. Maintain boat ramp for vessels to access water. Relocate relocated coastal rowing racks.
Client:
small vessel storage area to hardstand areas. 14. Retain OC6 craft in Chaplain Park. If required, raise the turf
11. Remove existing secondary amenities block. Reconfigure
area slightly to provide some flood immunity to OC6 craft.
05. Provide pedestrian pathways (subject to flood conditions) to area to accommodate a covered and lockable storage facility
link the foreshore to public amenities. for Outriggers (smaller craft), and maintenance facility/wash 15. Remove existing storage area in Noosa River Slipway. Storage
down bays for Outriggers and coastal rowers. Include an needs are to be accommodated within the new facility to be
06. Floating pontoon for canoe launching. Investigate use of
outdoor shower facility for use by Club and general public. located behind the NYRC.
existing poles to support new pontoon.
50
Noosa Shire Council
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.