 Performance Outcomes                         Acceptable Outcomes                 Response

 public assets are proven to be               train system including              Refer to Appendix F & G for
 suitable for its use and of a cost           replacement costs of asset parts.   further detail.
 effective and efficient standard.
                                              AO8.2                               AO8.2 Complies

                                              Treatment systems dedicated as      Refer to Appendix F & G for
                                              public assets are designed to       further detail.
                                              minimise maintenance, renewal
                                              and adaption costs and the
                                              requirement for specialised
                                              equipment, material or
                                              maintenance techniques.

                                              AO8.3                               AO8.3 Complies

                                              Vegetated stormwater                Refer to Appendix F & G for
                                              management systems to be            further detail.
                                              dedicated as public assets are
                                              established and maintained
                                              during the maintenance period to
                                              ensure optimal vegetated growth
                                              and that the functional elements
                                              of the system achieve the design
                                              function at the end of the
                                              maintenance period.

 PO9                                          AO9.1                               AO9.1 Complies

 Treatment systems are designed               Free draining inlets and outlets    Refer to Appendix F & G for
 to eliminate or minimise health,             are provided to ensure that         further detail.
 safety and aesthetic hazards,                waters do not pond for more than
 including risks associated with              24 hours.
 insect breeding, odour and public
 safety.                                      AO9.2                               AO9.2 Complies

                                              Developments are designed to        Refer to Appendix F & G for
                                              eliminate retaining walls in        further detail.
                                              excess of 0.8m for any water
                                              quality treatment device.

 Hydrology and waterway stability

 PO10                                         AO10                                AO10 Complies

 Development prevents increased               The development is designed to:     Refer to Appendix F & G for
 bed and bank erosion and                                                         further detail.
                                                  a) limit the peak 1 year ARI
 sedimentation in receiving
                                                     event discharge within
 waterways by avoiding changes
                                                     the receiving waterway
 in low rate, peak flow run-off and
                                                     to the pre-development
 flow duration.
                                                     peak 1 year discharge;
                                                  b) maximise pervious areas
                                                     by using pervious


URBIS
FINAL TOWN PLANNING REPORT - 47 GOODCHAP STREET                                                                   119
                                                                                    PLANNING SCHEME CODE ASSESSMENT

Log in to download the original (Appendix L - Code Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.