Original source · versioned page text
Appendix L - Code Assessment.pdf
Performance Outcomes Acceptable Outcomes Response
AO14.2 AO14.2Complies
Construction works are designed Refer to Appendix F & G for
and managed to restrict the further detail.
extent of clearing and soil
exposure to the minimum
necessary for access, and safe
construction at any one time.
AO14.3 AO14.3 Complies
For buildings: Refer to Appendix F & G for
further detail.
a) upstream runoff is
diverted around the
construction site;
b) sediment barriers are
provided downslope of
disturbed areas to
prevent sediment
washing into gutters,
drains and waterways ,
wetlands or drainage
lines either on or off the
site; and
c) temporary or permanent
downpipes are
connected to the
stormwater system
before laying the roof; or
d) localised erosion is
avoided by directing flow
from downpipes over
non-erosive areas.
AO14.4 AO14.4 Complies
Chemical flocculants used as Refer to Appendix F & G for
part of an erosion and sediment further detail.
control plan do not harm the
environmental values within
receiving waters.
AO14.5 AO14.5 Complies
Appropriately sized litter Refer to Appendix F & G for
containment areas, with provision further detail.
for sorting recyclables are
provided for the type of litter
expected to be generated onsite.
URBIS
FINAL TOWN PLANNING REPORT - 47 GOODCHAP STREET 123
PLANNING SCHEME CODE ASSESSMENT
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix L - Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.