Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix L - Code Assessment.pdf

of 95

Page text read automatically using OCR, there may be inaccuracies

 Performance Outcomes                   Acceptable Outcomes                       Response

 Development is designed and            The location and form of                  Refer to Appendix F & G for
 constructed to maintain surface        stormwater discharge points do            further detail.
 and ground water balances that         not alter the pre-development
 sustain the environmental values       hydrology of receiving surface
 of water dependent ecosystems,         water or groundwater.
 including downstream aquatic,
 riparian, wetland and terrestrial      AO13.2                                    Not Applicable
 ecosystems.                            Developments located on                   Development is not located on a
                                        groundwater recharge or                   groundwater recharge or
                                        discharge areas are designed              discharge area.
                                        and managed in accordance with
                                        a groundwater recharge and
                                        discharge management plan
                                        prepared by a suitably
                                        experienced and qualified
                                        groundwater hydrologist. The
                                        groundwater recharge or
                                        discharge must demonstrate that
                                        the development does not affect
                                        groundwater balances beyond
                                        the property boundaries.

                                       Editor's Note— PSP6 Engineering
                                       Design Standards - Roads, drainage and
                                       earthworks provides guidance on
                                       prepare a groundwater recharge and
                                       discharge plan.

 Construction and establishment of stormwater management systems

 PO14                                   AO14.1                                    AO14.1 Complies

 Construction methods provide for       An erosion and sediment control           Refer to Appendix F & G for
 appropriate controls to avoid          plan prepared in accordance with          further detail.
 entry and transport of litter,         the International Erosion Control
 sediment, and associated               Association Best Practice Books
 prescribed water contaminants          demonstrates that the capture
 into receiving waters.                 and release of stormwater
                                        achieves the design objectives
                                        listed in Table A: Construction
 Editor's note— Water contaminants      phase – stormwater
 are prescribed in the Environmental    management design objectives
 Protection Act 1994.                   of the State Planning Policy
                                        (Appendix 2).

                                        Editor’s note— PSP6 Engineering
                                        Design Standards - Roads, drainage
                                        and earthworks provides guidance on
                                        requirements for preparing an Erosion
                                        Management Plan.




                                                                                                                        URBIS
122PLANNING SCHEME CODE ASSESSMENT                                            FINAL TOWN PLANNING REPORT - 47 GOODCHAP STREET

Log in to download the original (Appendix L - Code Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.