Minor Change Attachment 3 Traffic Engineering Advice

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Table 8 Proposed Development Estimated Trip Generation by Trip Type
                                                          Trips
        Peak Period
                             New         Diverted Drop-in       Un-Diverted Drop-in                                                             Total
   Saturday AM Peak Hour                                227                              99                                  127                 453
   Thursday PM Peak Hour                                180                              79                                  100                 359

This trip segmentation was incorporated within the SIDRA analysis documented in the Revised Traffic
Report (17th September 2019).

Comparison to Previous Approval and Revised Traffic Report (Sept 2019)
The difference in peak hour total trip generation between the Previous Approval (MCU12/0051) and the
Proposed Development is summarised in Table 9.

Table 9 Traffic Generation Comparison – Previous Approval & Proposed Development
                                         Saturday Noon                    Thursday PM
    Development Scenario
                                      Peak Hour Total Trips           Peak Hour Total Trips
       Previous Approval                       820                            383
       Proposed Development                                                        453                                               359
         Difference Total Trips                                                   -367                                               -24

The Proposed Development is expected to generate approximately 367 fewer trips that the Previous
Approval in the Saturday noon peak hour.

The Proposed Development is also expected to generate fewer trips to the Previous Approval in the
Thursday PM peak hour. As such, the Proposed Development is expected to have comparable or lesser
impact on the surrounding network than the traffic assessment associated with the Previous Approval.

It is important to note that no external road network upgrades were required as part of the Previous
Approval over the site. Given the Proposed Development is expected to generate lower traffic volumes
that the Previous Approval, no road network upgrades are considered to be required to support the
proposed development.

This was also supported by the findings of the SIDRA assessment documented in Section 11 of the
Revised Traffic Report (dated 17th September 2019).

The difference in adopted peak hour total trip generation between the Revised Traffic Report
assessment and the currently Proposed Development is summarised in Table 10.




\\FILE\Projects\BLU0517\01\3. Deliverables\2. Letters\2.MinorChange\MinorChange2019_20 Hofmann Drive, Noosaville.docx   Cambray Consulting Pty Ltd | Page 8
Log in to download the original file

Minor Change Attachment 3 Traffic Engineering Advice.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.