Minor Change Attachment 3 Traffic Engineering Advice
Table 8 Proposed Development Estimated Trip Generation by Trip Type
Trips
Peak Period
New Diverted Drop-in Un-Diverted Drop-in Total
Saturday AM Peak Hour 227 99 127 453
Thursday PM Peak Hour 180 79 100 359
This trip segmentation was incorporated within the SIDRA analysis documented in the Revised Traffic
Report (17th September 2019).
Comparison to Previous Approval and Revised Traffic Report (Sept 2019)
The difference in peak hour total trip generation between the Previous Approval (MCU12/0051) and the
Proposed Development is summarised in Table 9.
Table 9 Traffic Generation Comparison – Previous Approval & Proposed Development
Saturday Noon Thursday PM
Development Scenario
Peak Hour Total Trips Peak Hour Total Trips
Previous Approval 820 383
Proposed Development 453 359
Difference Total Trips -367 -24
The Proposed Development is expected to generate approximately 367 fewer trips that the Previous
Approval in the Saturday noon peak hour.
The Proposed Development is also expected to generate fewer trips to the Previous Approval in the
Thursday PM peak hour. As such, the Proposed Development is expected to have comparable or lesser
impact on the surrounding network than the traffic assessment associated with the Previous Approval.
It is important to note that no external road network upgrades were required as part of the Previous
Approval over the site. Given the Proposed Development is expected to generate lower traffic volumes
that the Previous Approval, no road network upgrades are considered to be required to support the
proposed development.
This was also supported by the findings of the SIDRA assessment documented in Section 11 of the
Revised Traffic Report (dated 17th September 2019).
The difference in adopted peak hour total trip generation between the Revised Traffic Report
assessment and the currently Proposed Development is summarised in Table 10.
\\FILE\Projects\BLU0517\01\3. Deliverables\2. Letters\2.MinorChange\MinorChange2019_20 Hofmann Drive, Noosaville.docx Cambray Consulting Pty Ltd | Page 8