Original source · versioned page text
2016-10-11 S&O Agenda - Attachment 1 to Item 8 - Delegations of Authority
The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 OCTOBER 2016
reserves are exempt from the rear setback rule and may use determinants for “other
boundaries” on their rear boundary”. On blocks with more than one street frontage,
one common boundary shall be considered the rear boundary;
ii) within the Agriculture Uses Code amend the minimum lots size for grazing of poultry
as follows:
for lots of at least 4ha in size, up to 50 poultry are allowed with a setback of 40m
to the nearest boundaries;
for lots 10ha or greater, up to 1,000 poultry are allowed with a setback of 100m to
the boundaries.
iii) within the Community Uses Code for Open Space Type 2 camp ground, amend the
minimum lot size to 10ha and make them consistent only in the rural zone;
iv) within the Community Uses Code, Table 14-19 Open Space Type 2 camp ground,
remove specific requirements for Amenities and make reference to compliance with
the local law for accommodation parks;
v) within the Visitor Accommodation Code, Table 14-34 Type 1 Home Hosted, insert a
new solution S13.2 requiring a minimum boundary setback of 10 metres to side or
rear boundaries;
vi) within the Visitor Accommodation Code, Table 14-36 Type 3 Rural, insert a new
solution S34.2 requiring a minimum boundary setback of 40m to side and rear
boundaries; and
vii) add zoning and code provisions to apply to commercial leases on and adjacent to the
bank of the Noosa River.
B. Request the Chief Executive Officer to write to the Minister for State Development,
Infrastructure and Planning requesting a State Interest Review of the proposed
amendments and the Minister’s approval for Council to commence public consultation on
the proposed amendments.
Council has also initiated a review of the Priority Infrastructure Plan to bring it into compliance
with the Sustainable Planning Act as a Local Government Infrastructure Plan.
In December 2015 Council considered a report that provided an overview of the timeline,
resource requirements, estimated budget and other considerations for undertaking a new
planning scheme project. As a consequence, budget provision has been made for preparing the
new scheme and assembling a project team.
Ordinary Meeting, 17 December 2015, Item 3, Page 7
That Council note the report by the Special Projects Officer and Director, Planning &
Infrastructure to the Planning & Organisation Committee Meeting dated 8 December 2015 and:
A. Note the draft project brief for the new planning scheme project; and
B. Authorise the CEO to make an application to the Minister for an extension of time to amend
Council’s Priority Infrastructure Plan in accordance with the Local Government and Other
Legislation Amendment Act (No. 2) 2015 amendments to the Sustainable Planning Act
(2009) (SPA) sections 997, 979, 983 and 996.
Page 30 of 86
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.