Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment 4 - Decision Notice MCU16 0130

Attached to the e-mail Change to DA - MCU16/0130.01.msg.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

      Easements
34.   Unless otherwise agreed in writing by the relevant service provider, any public or third
      party infrastructure located on the subject site must be placed within an easement
      registered against the title of the property.
35.   All easements must be designed in accordance with the planning scheme and granted
      at no cost to the Grantee. Where the Grantee is Council or a service authority, the
      easement documentation must be in accordance with the Grantee’s standard easement
      terms. Draft easement documentation must be submitted to Council for endorsement.
36.   All works must be kept clear of any existing or proposed easements on the subject land,
      unless agreed otherwise in writing by the Grantee.
      Earthworks and Retaining Walls
37.   All fill and associated batters must be undertaken in accordance with an Operational
      Works approval, and contained entirely within the subject site unless written permission
      from the respective landowner(s) is provided to Council.
38.   All retaining walls must be designed and constructed in accordance with the planning
      scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
      walls that are publicly accessible and exceed 1.0m in height must be fitted with a
      commercial grade safety fence.
      Damage to Services and Assets
39.   Any damage caused to existing services and assets as a result of the development
      works must be repaired at no cost to the asset owner at the following times:
      a.   where the damage would cause a hazard to pedestrian or vehicle safety,
           immediately; or
      b.   where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and
      assets must first be referred to the relevant service authority for approval.
5.    REFERRAL AGENCIES

Not applicable.
6.    ADVISORY NOTES

      Development Compliance Inspection
1.    Prior to the commencement of the use, please contact Council's DA Planning Section to
      arrange a Development Compliance Inspection.
      Infrastructure Charges
2.    This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in
      accordance with Council’s “Charges Resolution” made pursuant to the planning
      legislation and regulations current at the time of issue. This Notice will be sent under
      separate cover.
7.    PROPERTY NOTES

Not applicable.
8.    PRELIMINARY APPROVAL OVERRIDING THE PLANNING SCHEME

Not applicable.




                                                                                    Page 6 of 10
Log in to download the original file

Attachment 4 - Decision Notice MCU16 0130.pdf · 102 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.