Decision Notice - Council Meeting Decision - MCU22 0051 [As Published] · MCU22/0051
ACID SULFATE SOILS
39. If earthworks trigger assessment, prepare an Acid Sulfate Soil Investigation Report and
if required an Acid Sulfate Soils Management Plan prior to the commencement of works.
The reports and analysis are to be undertaken in accordance with the Noosa Plan 2020
and prepared by a suitably qualified person.
40. Prior to the commencement of use, provide certification from a suitably qualified person
that all works have been undertaken in accordance with the Acid Sulfate Soil
Management Plan.
PREPARATION OF A PRELIMINARY CONSTRUCTION MANAGEMENT PLAN
41. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. Traffic management during all aspects of the construction phase including:
i. Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction.
b. Maintenance of safe pedestrian access for the areas affected by the works during
and after daily construction has ceased.
c. Provision for worker car parking.
d. Maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures.
e. Works programme identifying key components of the works and their respective
durations.
f. Include signage in prominent locations on the boundaries of the site advising of
the proposed development, the expected time frames and the site contact details.
g. Identification of complaint management procedures including:
i. Contact details for the on-site manager.
h. Dispute resolution procedures.
i. If the proposed earthworks exceed 1000m3, provide details on the location of
external fill sites/sources, the haulage route, type of vehicle to be utilised during
filling operations and frequency of usage. NB any damage to the existing road
system as a result of haulage operations shall be fully repaired at the applicant’s
expense.
j. It is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre- Start Meeting for the project.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Page 8 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision - MCU22 0051 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 181 KB (small file)
- File type
No other editions are linked here.