Decision Notice - Council Meeting Decision - MCU22 0051 [As Published] · MCU22/0051
ii. Are provided with a free-draining outlet from the sub-soil drainage system.
d. Incorporation of a primary stormwater quality treatment system for the effective
removal of gross pollutants.
32. Permanent educational signage must be erected to educate the customers to the
development about the function of the bioretention device(s). The dimensions, standard,
presentation and location of the educational signage must be in accordance with an
Operational Works approval.
33. All vegetated stormwater quality treatment devices must be maintained in accordance
with the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1)
and primary treatment devices maintained in accordance with the manufacturer’s
recommendations. The approved Operational Works drawings for the stormwater quality
treatment system and detailed life cycle costing of the system must be attached as an
addendum to this document and kept on site by the operator of the development.
Records of all maintenance activities undertaken must be kept and made available to
Council upon request.
EASEMENTS
34. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
35. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
36. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
EARTHWORKS AND RETAINING WALLS
37. All fill and associated batters must be undertaken in accordance with an Operational
Works approval and contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council. The Operational works approval
is to be generally in accordance with the Bulk Earthworks Plan C03-001 and Bulk
Earthworks Section C03-101 dated 21.02.2023 and prepared by Acor Consultants
38. Design all earth retaining structures within private land in accordance with Australian
Standards, Building Code requirements and Noosa Planning Scheme current the time of
the operational works application and the following:
a. Earth retaining structures must be certified by a Registered Professional Engineer
Queensland (RPEQ) where exceeding 1.0m in height.
b. The minimum design life (the period assumed in design for which a structure or
structural element is required to perform its intended purpose without replacement
or major structural repairs) for the earth retaining structure that is specified in Table
3.1 of Australian Standard AS4678;
c. Earth retaining structures within the land and around areas of cut on or near the
boundaries of the site must be designed to allow for live and dead loads associated
with the land/premise’s current occupancy use;
d. Where the adjoining land use rights or zoning allows for industrial uses a minimum
live load of 25kPA must be allowed in the design of the retaining structure for these
adjoining premises.
e. All retaining walls that are publicly accessible and exceed 1.0m in height must be
fitted with a commercial grade safety fence.
Page 7 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision - MCU22 0051 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 181 KB (small file)
- File type
No other editions are linked here.