Table 6.3.3 Treatment Train Effectiveness
Flow TSS TP TN Gross
ML/y Kg/y Kg/y Kg/y Pollutant
Kg/y
Source Load 3.41 421 1.09 11.0 72.9
Residual Load 2.18 82.9 0.266 3.45 2.38
% Reduction 35.9 80.3 75.5 68.6 96.7
%Target - 80 60 45 90
Reduction
Please note that stochastic generation of pollutant loads has been
enabled so model results will vary slightly between runs.
Refer to Appendix C for MUSIC modelling files.
6.3.4 Maintenance
A recommended maintenance schedule for elements of the water
quality treatment train is outlined in Table 6.3.4.
Table 6.3.4: Treatment Train Maintenance Schedule
Minimum
Device Task Labour Plant Frequency Maximu Failure
per m Mode
Annum Frequenc
y
Bioretentio Inspection Maintenance staff 12 - Grass
n Area 1 man Whipper exceeds
Snipper 250mm in
Maintenance staff Mower height.
Mowing 1 man 12 As Ponding in
required excess of 24
Maintenance staff Shovel & hrs.
2 men Truck Accumulatio
Cleaning 4 n of sediment
As or gross
required pollutants.
___________________________________________________________________________________
A6035/21/Engineering Report/30-32 Doonella Street, Tewantin Page 8 of 9
May 2021 WM/tk
Alta Projects P/L
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.