Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
Inspection Maintenance staff - 4 As Excessive
1 man during required ponding.
rainfall Downstream
Stormwater events. scouring.
Outlet Discoloured
discharge.
Rectificatio Environmental - As -
Unacceptable
n Consultant required
odours.
7.0 CONCLUSION
The proposed commercial unit development over existing Lot 32 RP893427 and
Lot 903 T 1631 can be readily serviced by existing water, sewer, electrical and
telecommunications infrastructure.
There are no significant earthworks required.
A complying water quality management scheme can be effectively implemented
in accordance with Noosa Council requirements.
With the provision of a roof water attenuation tank, existing discharge flow rates
can be maintained at Doonella Street.
There are no constraints or impediments for the proposed development that
cannot be overcome by ongoing design and construction.
___________________________________________________________________________________
A6035/21/Engineering Report/30-32 Doonella Street, Tewantin Page 9 of 9
May 2021 WM/tk
Alta Projects P/L
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.