Skip to the record
Accept no substitutions.

Original source · versioned page text

Attachment I - Updated Engineering Report & SWMP

of 120

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

              Inspection     Maintenance staff     -            4           As        Excessive
                                  1 man                      during      required      ponding.
                                                             rainfall                Downstream
Stormwater                                                   events.                  scouring.
  Outlet                                                                             Discoloured
                                                                                      discharge.
              Rectificatio    Environmental        -           As            -
                                                                                     Unacceptable
                   n           Consultant                   required
                                                                                        odours.




   7.0       CONCLUSION

   The proposed commercial unit development over existing Lot 32 RP893427 and
   Lot 903 T 1631 can be readily serviced by existing water, sewer, electrical and
   telecommunications infrastructure.

   There are no significant earthworks required.

   A complying water quality management scheme can be effectively implemented
   in accordance with Noosa Council requirements.

   With the provision of a roof water attenuation tank, existing discharge flow rates
   can be maintained at Doonella Street.

   There are no constraints or impediments for the proposed development that
   cannot be overcome by ongoing design and construction.




   ___________________________________________________________________________________
   A6035/21/Engineering Report/30-32 Doonella Street, Tewantin                  Page 9 of 9
   May 2021    WM/tk
                                       Alta Projects P/L

Log in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.