Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
Original PDF page 16, section 6. The text section number identifies this passage in the reader.
|
|
| || |
| || |
\
| | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| | |
|
| | | |
\
RM
|
4. THE EXCAVATION IS TO BE MAINTAINED IN A DRAINED STATE FOR THE PERIOD OF
\
/ \/ \ / \ / \ / \ / \/ \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \/ \
\
\
CONSTRUCTION VIA THE USES OF TEMPORARY SUMPS & PUMPING TO DISCHARGE TO
\
RM
E/UG
E/UG
NOTE:
\
\
E/UG
E/UG
THE EXTERNAL STORMWATER SYSTEM.
\
EARTHWORK QUANTITIES ARE NET VOLUMES. NO
/ \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \/ \ / \ / \ / \ / \
RM
\
E/UG
H-2.7 H-1.7
\
\
RETAINING WALL REFER ALLOWANCE HAS BEEN MADE FOR BULKING OR COMPACTION.
\
RM
\
5. ALL EXCAVATIONS TO BE BATTERED BACK AT THE MATERIAL'S ANGLE OF REPOSE OR
\
\
STRUCTURAL DWGS FOR
\
SHORED VIA SHEET PILING OR OTHER APPROVED METHODS.
RM
\ \
DETAILS
\
\
RM
\
\
SECTION E
\
EARTHWORKS NOTES:
\
RM
\
\
DWG R08
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.