Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
Original PDF page 16, section 7. The text section number identifies this passage in the reader.
\
\
RM
1. THE CONTRACTOR SHALL IMPLEMENT THE SEDIMENT CONTROL MEASURES DETAILED.
\
\
D
\
ALL PERIMETER CONTROL MEASURES SHALL BE INSTALLED PRIOR TO DISTURBANCE OF
\
RM
\
\
THE SITE.
\
\
RM
\
\
D
\
\
RM
2. THE CONTRACTOR IS TO ALLOW FOR STRIPPING AND STOCKPILING TOPSOIL FOR
\
H0.1
\
\
FUTURE USE. REFER SEDIMENT AND EROSION CONTROL NOTES FOR TREATMENT H1.7
\
RM
||
\ \ \ \ \ \
\
|
|
00 00
|
|
D.P
|
D
| |
DETAILS.
|
6.8 8.4
H0.2
|
D |
|
| |
|
RM
|
RM RM RM RM RM RM RM
D
|
|
|
\\ \\ \\ \\
|
|
RM
\ \ \ \
|
\\ \ \ \\ \ \ \ \ \\ \ \ \\ \\ \ \ \\ \ \ \ \ \\ \ \ \\ \\ \ \ \\ \ \ \\ \\ \ \ \\ \ \ \ \ \\ \ \ \\ \\ \ \ \\ \ \ \ \ \\ \ \ \\ \\ \ \ \\ \ \ \ \ \\ \ \ \\ \\ \ \ \\ \ \ \ \ \\ \ \ \\ \\ \ \ \\ \ \ \\ \\
|
D
|
H-1.0
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
D
RL 4.60 67
RM
3. FILL IS TO BE PLACED IN ACCORDANCE WITH THE REQUIREMENTS OF AS 3798-2007
RM RM RM
RM RM
//
5.5
RM RM
RM RM RM
RM
RM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.