Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
EROSION & SEDIMENT CONTROL NOTES
EROSION & SEDIMENT CONTROL 1. ALL SEDIMENT & EROSION CONTROL DEVICES ARE TO BE INSTALLED IN
INSTALLATION SEQUENCING ACCORDANCE WITH THE I E AUST SOIL EROSION & SEDIMENT CONTROL
MANUAL, AS DETAILED ON THIS PLAN, OR AS REQUIRED FOR
INSTALLATION OF ENTRY / EXIT DAY 1 \
\
\
\
\
\
\
\
\
COMPLIANCE WITH THE REQUIREMENTS OF THE ENVIRONMENTAL
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
MANAGEMENT PLAN.
\
\
\
\
\
INSTALLATION OF PERIMETER SEDIMENT FENCES DAY 1
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.