Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
Original PDF page 17, section 2. The text section number identifies this passage in the reader.
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\ \ \ \ \ \ \ \ \ \ \ \ \
\
\
\
\
\
\
\
\
\
\
\
\
\
\
EXCAVATION OF SEDIMENT BASINS INCLUDING PRIOR TO STRIPPING 2. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT &
RM
\
\
\
\
INSTALLATION OF ENTRY CHUTES AND OF TOPSOIL AND
\
\
\
EROSION CONTROL DEVICES ARE INSPECTED & MAINTAINED AS
\
\
\
\
\
RM
\
\
\
\
\
\
\
\
OVERFLOW STABILISATION BULK EARTHWORKS
\
\
\
\
FOLLOWS:
\
\
\
\
\
\
\\
\
\
\
\
\
\
\
\
E/OH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.