RM
4. ALL STOCKPILES TO BE TEMPORARILY GRASSED & GRADED TO ENSURE
PLACE AND MAINTAINED UNTIL 80% OF GROUNDCOVER IS ACHIEVED
X
RM
CONTROL OF RUNOFF. ALTERNATIVELY, SEDIMENT FENCES TO THE
OR AS DIRECTED BY THE SUPERVISING ENGINEER. DOWNSTREAM FACE OF STOCKPILES ARE TO BE INSTALLED, WITH
RM
CUT-OFF DRAINS UPSTREAM.
RM
X
D
RM
5. ROUGHEN ALL SURFACES PRIOR TO TOPSOIL PLACEMENT.
ROUGHENING TO CONSIST OF LATERAL (90° TO SLOPE) GROOVES
RM
100mm DEEP AT 2m MAX. SPACINGS.
D
X
RM
RM
D
|||
||| |||
D.P 6. ALL EXPOSED SURFACES, ONCE COMPLETED SHALL BE IMMEDIATELY
|||
D
|||
STABILISED TO PREVENT EROSION. ROUGHEN SURFACE BY FORMING
RM
RM RM RM RM RM
D
|||
RM
|||
D MANHOLE
LATERAL GROOVES 50mm DEEP AT 1m MAX. SPACINGS AND 5m MAX.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
ACCESS
|||
D
RM
|||
RM RM RM
RM
RM MANHOLE
//
RM RM RM
RM
LENGTHS.
RM
RM
RM
D ACCESS
|||
//
|||
//
|||
|||
//
STORE STORE STORE STORE STORE STORE STORE
TEMPORARY SEDIMENT BASIN |||
||| |||
7. SEDIMENT & EROSION CONTROL DEVICES (OTHER THAN THOSE
//
D
//
ALREADY SHOWN) TO BE INSTALLED WHERE NECESSARY & AS
//
//
//
//
DIRECTED ON SITE BY THE SUPERINTENDENT.
D
BIO BASIN
//
8. SEDIMENT & EROSION CONTROL DEVICES ON THIS PLAN ARE
//
//
INDICATIVE ONLY. IT IS THE RESPONSIBILITY OF THE SITE MANAGER TO
//
ENSURE THAT THE INTENT OF THIS PLAN AND THE ENVIRONMENTAL
//
D
//
MANAGEMENT PLAN ARE COMPLIED WITH.
//
//
//
9. EROSION AND SEDIMENT CONTROL DEVICES/STRATEGIES TO BE
//
D
//
| | | | | | | | | | |
COMPLETED PRIOR TO DISTURBANCE OF THE SITE, AND SHALL REMAIN
//
|
IN PLACE UNTIL PERMANENT WORKS ARE COMPLETE AND CATCHMENT
//
//
VEGETATION IS ESTABLISHED (75% GRASS COVER MINIMUM) .
//
D
//
//
//
10. AREAS OF WORKS THAT REQUIRE DISTURBANCE OF SOIL SHALL BE
//
X
//
KEPT TO A MINIMUM TO LIMIT THE EXPOSURE OF SOIL TO RAIN-DROP
D
//
CARPARK
>
IMPACT AND OTHER FORMS OF WIND/STORMWATER See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.