Attachment I - Updated Engineering Report & SWMP
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
Refer to preliminary infrastructure drawings in Appendix B for service
connection locations.
4.3 Electricity and Telecommunications
Power and telecommunications are both available from Doonella Street
overhead network.
5.0 ACCESS
Access to the site will be via two separate commercial crossovers from Doonella
Street into on-grade car parking, located in a semi-basement ground floor.
Carparks, ramps and parking aisles internal to the site have been designed in
accordance with AS2890.1 – ‘Off Street Parking’.
On-grade car parking is proposed to provide necessary off-street car parking.
Refuse collection is proposed from the North-west corner of the site in Sidoni Lane,
as requested by Noosa Council.
6.0 STORMWATER MANAGEMENT
6.1 Legal Point of Discharge
The subject site currently discharges to Doonella Street, the sites legal point
of discharge. In order to replicate existing conditions with regard to
stormwater runoff it is intended to pipe 100% of roofwater and podium
surfaces to a rainwater detention and reuse tank positioned in the eastern
side of the carpark. Roof water and podium drainage collection will be
sized to convey up to and including a 1% AEP event.
The tank will ensure non worsening flows in order to maintain the existing
stormwater properties of the site. This flow will be released via detained
orifice flow from the rainwater detention tank and piped to the existing
stormwater infrastructure along Doonella Street. Environmental flows will
be directed to a Bioretention Basin to ensure reduced pollutant loads are
satisfied as per Water by Design targets (Appendix A – WSUD Design
Objectives for Queensland).
There is a small catchment of the site that bypasses the bio retention basin
due to site levels. It is proposed that the bypass area be treated using
landscaped swales. Refer to Appendix C - MUSIC Model for detailed swale
properties.
___________________________________________________________________________________
A6035/21/Engineering Report/30-32 Doonella Street, Tewantin Page 3 of 9
May 2021 WM/tk
Alta Projects P/L
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.