6.2 Stormwater Quantity Management
The proposed development will see the percentage impervious area
increase. Un-attenuated this would result in an increase in peak flow
discharge off the site. As a result, a mixed use detention and reuse tank is
proposed to capture runoff, detain flows and slowly release captured runoff
to ensure non-worsening of peak discharges is achieved. Q100 roof podium
flows will be directly connected to the detention tank.
Hydraulic modelling of the attenuation tank is provided in Appendix D.
The model identifies that a 75.4KL (18.4KL detention and 57KL reuse) tank
will ensure discharged flow rates do not increase with this development.
Figure 6.2 shows the assumptions that were used in the calculating an
adequately sized detention tank. Rainfall Intensity Frequency Duration
Data and Temporal Patterns were taken from the Bureau of Meteorology,
using latitude and longitude coordinates provided by Google Maps. Once
all data was imported into excel a rainfall intensity table was created.
Appendix D includes Bom IFD chart and curves for ARR19 rainfall event of
varying frequency.
Figure 6.2
___________________________________________________________________________________
A6035/21/Engineering Report/30-32 Doonella Street, Tewantin Page 4 of 9
May 2021 WM/tk
Alta Projects P/L
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.