Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Attachment I - Updated Engineering Report & SWMP

of 120

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

              The efficiency of the proposed treatment train has been identified by
              the Model for Urban Stormwater Improvement Conceptualisation
              (MUSIC) developed by Monash University.

              A conceptual layout of the treatment train for the site, as input to the
              MUSIC Model, is shown in Figure 6.3.




                         Figure 6.3: MUSIC Model Layout

              The location and details of the water quality treatment device is
              shown on the preliminary engineering drawings contained in
              appendix B.



              6.3.2 MUSIC Model Input

              The Rainfall Runoff Parameters for the source catchments have been
              taken from Water By Design’s – MUSIC Modelling Guidelines,
              Version 1.0 2010 and are shown in Table 6.3.2.



___________________________________________________________________________________
A6035/21/Engineering Report/30-32 Doonella Street, Tewantin                  Page 6 of 9
May 2021    WM/tk
                                    Alta Projects P/L

Log in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.