Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
Table 6.2a compares pre and post development flows with the implementation of
the detention tank, with a range of frequent and infrequent storm events for the
ARR19 IFD.
Table 6.2.a: Pre v Post Developed Flows
Refer to Appendix D for full Detention Tank modelling results and data
provided by the Australian Government, Bureau of Meteorology.
6.3 Stormwater Quality Management
In accordance with Noosa Council planning scheme requirements
water quality treatment will be required to be provided. Stormwater
Quality Treatment is proposed to be undertaken via the
implementation of a bioretention basin and swales.
The Healthy Waterways Water Sensitive Urban Design Guidelines
for South East Queensland recommends that stormwater quality
treatment trains are designed to achieve the following reductions in
mean annual pollutant loads, compared to the traditional untreated
case.
80% reduction in Suspended Solids and Gross Pollutants
60% reduction in Total Phosphorous
45% reduction in Total Nitrogen
90% reduction in Gross Pollutants
6.3.1 Proposed MUSIC Model Concept
The concrete roadway and parking and roof water runoff will drain
directly to stormwater pits which will connect into the bioretention
basin, via the detention tank.
___________________________________________________________________________________
A6035/21/Engineering Report/30-32 Doonella Street, Tewantin Page 5 of 9
May 2021 WM/tk
Alta Projects P/L
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.