Decision Notice - Minor Change - 132007 738 05 [As published]
65. Where retained trees are located in areas proposed to be filled on the site (or are located on
neighbouring allotments to the area to be filled), there will be a need to prevent fill material
from being placed on the tree’s root system. To this end, the design of any filling works will
need to incorporate terracing around the tree or a similar means of ensuring that the natural
ground level around the trees remains generally the same as existing. These measures shall
clearly be shown on the plans submitted for Operational Works approval and any drainage
required to drain these areas shall also be shown on the plans.
66. An environmental maintenance period of 12 months shall commence after the Landscaped
area has been re-vegetated and all declared & environmental weeds have been removed
from the entire property. Council’s appointed Environmental Officer shall sign the
maintenance period ‘on’ and ‘off’ after this work has been successfully completed. To this
extent, the Officer has the discretion to pause the maintenance period if work has not been
carried out as instructed or if lengthy time delays occur.
Erosion and Sediment Control
67. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required
to be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure (amended 1/07/2019)
68. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $25,474.00
PSP16 – Sewerage Headworks Contributions $62,375.00
PSP17 – Water Supply Headworks Contributions $54,735.00
PSP20 – Pathway Trunk Network Contributions $26,614.00
TOTAL Contribution Amount = $169,198.00
Please note that these amounts are all subject to variations in the Consumer Price Index,
All Groups Brisbane from March 2019 until the date of payment.
All contributions must be paid prior to the change of use happens.
General
69. A suitably qualified Registered Professional Engineer shall prepare engineering drawings
and specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works. In this regard a DXF/DWG file
on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
with any application for Operational Works.
70. Digital detailed designs including drawings, calculations, specifications and a schedule of
works, shall be submitted with any application for a Development Permit for Operational
Works in respect of stormwater drainage works. The design shall be in accordance with
Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads,
Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing
and proposed services required by the development shall be shown on the plans.
Page 10 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024