Decision Notice - Minor Change - 132007 738 05 [As published]

of 17

Page text shows just the words. Original shows the document exactly as it was published.

               65.    Where retained trees are located in areas proposed to be filled on the site (or are located on
                      neighbouring allotments to the area to be filled), there will be a need to prevent fill material
                      from being placed on the tree’s root system. To this end, the design of any filling works will
                      need to incorporate terracing around the tree or a similar means of ensuring that the natural
                      ground level around the trees remains generally the same as existing. These measures shall
                      clearly be shown on the plans submitted for Operational Works approval and any drainage
                      required to drain these areas shall also be shown on the plans.
               66.    An environmental maintenance period of 12 months shall commence after the Landscaped
                      area has been re-vegetated and all declared & environmental weeds have been removed
                      from the entire property. Council’s appointed Environmental Officer shall sign the
                      maintenance period ‘on’ and ‘off’ after this work has been successfully completed. To this
                      extent, the Officer has the discretion to pause the maintenance period if work has not been
                      carried out as instructed or if lengthy time delays occur.
               Erosion and Sediment Control
               67.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                      site. Site control measures such as silt fencing, controlled gravel access to the site and
                      controlled disposal of waste, will be necessary.
                      In this regard plans detailing the methods of controlling erosion and sediment are required
                      to be submitted to the Council for approval prior to obtaining a Development Permit for
                      Operational Works.
               Contributions Towards Council Infrastructure (amended 1/07/2019)
               68.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
                      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
                      only of the contribution amounts under the current Council policies and requirements is
                      outlined in the table below:

                        Contribution Required For: Amount:
                        PSP12 – Public Open Space Contributions (Park)             $25,474.00
                        PSP16 – Sewerage Headworks Contributions                   $62,375.00
                        PSP17 – Water Supply Headworks Contributions               $54,735.00
                        PSP20 – Pathway Trunk Network Contributions                $26,614.00
                        TOTAL Contribution Amount =                                $169,198.00
                        Please note that these amounts are all subject to variations in the Consumer Price Index,
                        All Groups Brisbane from March 2019 until the date of payment.

                       All contributions must be paid prior to the change of use happens.
               General
               69.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings
                      and specifications for all engineering works, which shall be submitted in conjunction with an
                      application for a Development Permit for Operational Works. In this regard a DXF/DWG file
                      on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
                      with any application for Operational Works.
               70.    Digital detailed designs including drawings, calculations, specifications and a schedule of
                      works, shall be submitted with any application for a Development Permit for Operational
                      Works in respect of stormwater drainage works. The design shall be in accordance with
                      Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads,
                      Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing
                      and proposed services required by the development shall be shown on the plans.




                                                                                                      Page 10 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024
Log in to download the original file

Decision Notice - Minor Change - 132007 738 05 [As published].pdf · 214 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.