Decision Notice - Minor Change - 132007 738 05 [As published]
71. A construction management plan/strategy to ensure no damage occurs to Council services
shall be prepared by a suitably qualified Registered Professional Engineer and submitted to
Council in conjunction with any application for Operational Works.
72. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
73. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
74. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
75. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level
and type of all services and structures. All of which shall be submitted to Council for checking
and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to
drainage structures, finished ground levels and pavement surface levels. The data shall be
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on
the use of ADAC are available at www.adac.com.au).
76. Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
Environmental Health
77. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
78. The Operational Waste Management Plan (OWMP) dated 20 May 2008 submitted is not
approved and shall be amended and re-submitted to Council for approval prior to the issue
of a Development Permit for Operational Works. The revised OWMP shall address the
following:
a. Additional skip bin storage areas for Bulk Recyclables for the eastern and western
areas of the development in addition to the refuse storage areas as indicated in the
Operational Waste Management Plan dated 20 May 2008 Job No. 7800/62.
b. Provision for waste generated from food, mechanical, boat repair and other industries,
in accordance with the range of approved uses.
c. A minimum separation distance of 500mm between bins to be collected by robotic arm.
d. Flat or minimal grades where industrial bins are to be manually shifted by refuse
collectors.
e. The role of the Body Corporate Manager is to be clarified. If no on-site manager is
proposed then the OWMP is to be revised to adequately address the day-to-day
management of waste issues on the site.
79. There shall be no awnings or building overhangs along the refuse truck travel path or
manoeuvring areas.
80. A Waste Management Plan (Construction) shall be submitted in accordance with Planning
Scheme Policy 11, Waste Management Plans. Waste storage areas are to provide for
adequate separation of all reusable, recyclable and waste materials. These shall be located
so that they are convenient and safe to use (refer to Noosa Council Waste Management
Code).
The Plan shall contain the following information:
Page 11 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original