Decision Notice - Minor Change - 132007 738 05 [As published]

of 17

Page text shows just the words. Original shows the document exactly as it was published.

                      The approved maintenance plan shall be incorporated in the Community Management
                      Scheme for the development and a copy of this shall be provided for Council’s records prior
                      to commencement of the approved Use.
                      A Development Permit for Building Works shall not be granted until a Development Permit
                      for Operational Works has been issued in regard to the drainage scheme.
               42.    All site stormwater drainage shall be by means of a gravity system.
               43.    Prior to issue of any Operational Works Approval for the development, the applicant must
                      provide Council with an updated stormwater quality management plan for the site that
                      demonstrates that the following targets are achievable within the development design
                      including for each individual stage of development:
                      a.      All stormwater from the site must be treated to achieve the following pollution reduction
                              targets:
                              •        80% reduction in Total Suspended Solids
                              •        60% reduction in Total Phosphorous
                              •        45% reduction in Total Nitrogen
                      Where Bioretention basins are proposed to achieve the outcomes, they must be designed in
                      accordance with the Water By Design Technical Design Guidelines and demonstrate that all
                      infrastructure that is part of the bioretention basin is not likely to become compromised by
                      future sea-level rises.
               44.    Any bioretention basins must be maintained in accordance with the Water by Design
                      Technical Design Guidelines and records made available to Council on request.
                      Bioretention basin maintenance requirements must be incorporated in the Community
                      Management Scheme for the development and a copy of this must be provided for
                      Council’s records prior to commencement of the approved use.
               45.    The site shall be connected to Unitywater’s existing sewerage reticulation systems and be
                      constructed in accordance with Council’s standards and requirements at no cost to Council.
               46.    The design for the sewer layout on the site shall be generally in accordance to Drawing No
                      06105 - 2 dated 3 November 2007 by Callaghan & Toth titled Proposed Site Layout Levels
                      & Sewer Plan.
               47.    Any building or structure within proximity of an easement or any other public utility’s
                      underground must have its foundations designed so that no surcharge loads are imposed
                      upon such underground infrastructure. Foundations must be taken down a minimum of 1.0m
                      below a line of influence measured 1.0m in the direction of the foundation from the centreline
                      of the closest underground service and along the natural angle of repose of the foundation
                      soil type(s).
                      Plans, and supportive documents, detailing these proposed foundations shall be designed
                      by a registered practicing Geotechnical Engineer and submitted with the application for a
                      Development Permit for Operational Works.
               48.    There shall be no encroachments on Council easements by any buildings or structures (eg.
                      ponds, retaining walls exceeding 1m in height, raised terraces, aboveground or underground
                      water tanks, air conditioning units, ancillary buildings and the like).
               49.    All proposed underground services on the site shall not interfere with the function or the
                      access to the existing Council’s services on the site. To this end the applicant shall provide
                      general plan showing all the existing and proposed services and easements on and adjacent
                      the site to be submitted to council in conjunction with the application for Operational Works.
               Town Water Supply
               50.    The site shall be connected to Unitywater’s existing town water supply and be constructed in
                      accordance with Unitywater’s standards and requirements at no cost to Unitywater.




                                                                                                         Page 7 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024
Log in to download the original file

Decision Notice - Minor Change - 132007 738 05 [As published].pdf · 214 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.