Noosa on Weyba
Traffic Impact Assessment
Table 4-8 Walter Hay Drive/Eenie Creek Road Roundabout SIDRA Results
2012 Traffic Count Existing 0.56 8s 31m 0.51 7s 26m
2014 Background Traffic Existing 0.62 8s 39m 0.56 7s 31m
2014 Background with
Existing 0.71 10s 53m 0.70 8s 48m
Development Traffic
2024 Background Traffic Existing 1.00 25s 210m 0.89 12s 101m
2024 Background with
Existing 1.10 72s 434m 1.07 27s 363m
Development Traffic
2024 Background Traffic Mitigated 0.70 13s 99m 0.49 8s 33m
2024 Background with
Mitigated 0.68 9s 47m 0.69 10s 50m
Development Traffic
Note: Due to flow balancing, operation of the mitigated layout is better in 2024 post-development in the AM peak.
The analysis suggests that in 2014, the Walter Hay DrivelEenie Creek Road roundabout operates within
recognised capacity limits, with and without development traffic, and fractionally above the Noosa Plan 2006
desired DOS limits.
At the 2024 design horizon, The Walter Hay Drive/Eenie Creek Road roundabout operates above recognised
capacity limits irrespective of development traffic levels.
To accommodate background traffic levels in 2024, minor mitigations as shown in Figure 4-6 are required;
involving the reallocation of lanes on the southern approach, and the addition of short approach and exit
lanes on the northern leg. With this mitigated layout, and under 2024 background traffic, the intersection
remains within recognised capacity limits, and within the Noosa Plan 2006 desired thresholds with and
without development traffic.
4.2.7 Summary of Intersection Analysis
The analysis above has been summarised on Table 4-10 for ease of reference.
Table 4-9 Summary of Intersection Pe ormance Pre and Post Development
2014 Backg round 2~14 Background 2024 Backg round 2~24 Background
with Development with Development
TraffIC TraffIC
Traffic Traffic
Eumundi Noosa Road/Emu
Within Capacity Within Capacity Within Capacity Within Capacity
Mountain Road
Emu Mountain Road/Walter
Within Capacity Within Capacity Within Capacity Within Capacity
Hay Drive/Eumarella Road
Site Access/Walter Hay Drive Within Capacity Within Capacity Within Capacity Within Capacity
Walter Hay Drive/Noosa Civic
Within Capacity Within Capacity Within Capacity Within Capacity
Shopping Centre
Walter Hay Drive/Eenie Creek
Within Capacity Within Capacity Within Capacity Within Capacity
Road
Eumundi Noosa Road/Emu Minor mitigations Minor mitigations
Within Capacity Within Capacity
Mountain Road required required
From the above it is clear that the Noosa on Weyba development traffic can be readily accommodated by the
existing road infrastructure in the study area to the 2024 design horizon. The exception to this is the
Eumundi Noosa Road/Emu Mountain Road intersection which requires minimal mitigations in order to
operate within capacity. This is however due mostly to background traffic levels at the 2024 design horizon.
510119 Cardno November 2012
Prepared for Northbrook Corporation Pty Ud Page 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 15 of 37 Appendix 13 - Traffic Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 65.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.