Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12/0208

of 134

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (65.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                         Noosa on Weyba
                                                                                                 Traffic Impact Assessment




4.2.8          Walter Hay Drive/Nosa Civic Southern Access         -
                                                                       Sensitivity Testing
The roundabout on Walter Hay Drive north of the development site is referred herein as the Noosa Civic
Southern Access       currently has a blind leg given that future development of Noosa Civic has not yet
progressed.
The impact of any expansion to the Noosa Civic Centre has not been included in this assessment given that
at the time of preparationno current approval for expansion to the development. As a sensitivity analysis

however  operational analysis has been undertaken using the revised traffic analysis is undertaken by
Cardno in November 2010. The impact of additional traffic or the intersection operation is outlined in Figure
4-7 below

Figure 4-7     Walter Hay Drivel Noosa Civic Southern Access



                                t
                                                               W~lt.r I’t\ay Dri\l~ (N)
                                                                       I     I




                                                                       I

                                                               Waltl!f Hay Dr1’11e (:5)




Table 4-10     Walter Hay Drive/Noosa Civic South Entrance (Stage 3)




 2022 Background + Noosa
  Civic Shopping Centre +           Existing   0.37      5s                24m            0.33      5s           21m
  Stage 2 and 3 expansion




510119                                                Cardno                                              November 2012
Prepared for Northbrook Corporation Pty LId                                                                       Page 30

Used in these records

About this file

File size
65.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12_0208.pdf · 65.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.