4.3 Travel Time Impacts
Following initial discussions with Council and their traffic representative Colin Beard, Council identified that
their primary traffic concern was that the development could prejudice the objective of Walter Hay Drive
which Council identified was to act as an alternative route to resolve on Eumundi-Noosa Road.
Of particular note was a concern that provision of another intersection on Walter Hay Drive would increase
the route delays such as that the route would not be effective as an active alternative
4.3.1 Assessment Methodology
Council has identified that no transport modelling of the routes exist and therefore in order to assess the
validity of these concerns Cardno agreed a methodology to analyse the current and future operational delays
on the two routes.
Travel time surveys were performed for four routes utilising either Eumundi-Noosa Road, or Walter Hay
Drive. The results of this survey are included at Appendix E. Delay was subsequently simulated using a
combination of SIDRA Intersection 5.1 to analyse intersection delay, and first principals to quantify the delays
associated with a change in the posted speed limit. The results for the delay analysis are shown below in
Table 4-11, with the summary of results from the analysis are provided Figure 4-8.
Table 4-11 Additional Delays on Walter Hay Drive
Noosa Civic
Expansion additional 5.1s 3.4s 5.1s 3.4s
Delay
Development Speed
7.5s 7.5s 7.5s 7.5s
Limit Change Delay
Development 12.1s 12.8s 11.7s 12.9s
Intersection Delay
4.3.2 Travel Time Impact
The addition of the Weyba on Noosa development access roundabout on Walter Hay Drive, will add on
average no more than 12.9 seconds to the route travel time from Eumundi-Noosa Road to Eenie Creek
Road. This represents in the order of a 4% increase in total travel time, which is in itself not considered
significant and if reported relevant to average trip length would be even less significant.
The impact of the roundabout would be to reduce the total benefit of the Walter Hay Drive route during a
typical northbound AM journey from 29.9 seconds to 17.8 seconds. This represents a reduction in
percentage benefit for Walter Hay Drive from 8.7% to 5.1 %. This does not represent a considerable
reduction and is unlikely to affect route choice in the area.
It is important to highlight that the journey times examined relate only to the study area, as illustrated in
Figure 4-8. In reality trips along Walter Hay Drive and Eumundi-Noosa Road would be part of a much longer
journey. This would mean that the percentage increase in travel time for total journeys would end up being
much less than that for the area included within this assessment. The travel time surveys are provided at
Appendix E.
510119 Cardno November 2012
Prepared for Northbrook Corporation Pty LId Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 15 of 37 Appendix 13 - Traffic Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 65.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.