Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                            main bathroom in accordance with the Queensland Plumbing                             Ensure that all persons below the work area have Personal Protective          regularly checked and Personal Protective Equipment should be used            collapse. Warning signs and barriers to prevent accidental or
                                            and Wastewater Code.                                                                 Equipment.                                                                    in accordance with manufacturer’s specification.                              unauthorised access to all excavations should be provided.
¿ play your part - print on recycled paper
                                            Safety Notes                                                                         Building components                                                           Hazardous substances                                                          Enclosed spaces
                                            Falls, slips, trips                                                                  During construction, renovation or demolition of this building, parts of      Asbestos                                                                      Enclosed spaces within this building may present a risk to persons
                                            Working at heights during construction                                               the structure including fabricated steelwork, heavy panels and many           This site currently has an existing home to be demolished. The                entering for construction, maintenance or any other purpose. The
                                            Wherever possible, components for this building should be                            other components will remain standing prior to or after supporting parts      demolition works are to be designed and detailed by others. The builder       design documentation calls for warning signs and barriers to
                                            prefabricated off-site or at ground level to minimise the risk of workers            are in place. Contractors should ensure that temporary bracing or other       should check and, if necessary, take appropriate action before                unauthorised access. These should be maintained throughout the life of
                                            falling more than two metres. However, construction of this building will            required support is in place at all times when collapse which may injure      commencement of works to ensure that the removal of any existing              the building. Where workers are required to enter enclosed spaces, air
                                            require workers to be working at heights where a fall in excess of two               persons in the area is a possibility.                                         hazardous materials that may be present on the site. Should any               testing equipment and Personal Protective Equipment should be
                                            metres is possible and injury is likely to result from such a fall. The                                                                                            remains of hazardous materials be discovered the builder shall to steps       provided.
                                            builder should provide a suitable barrier wherever a person is required              Mechanical lifting of materials and components during construction,           as deemed appropriate to remove such hazardous materials.
                                            to work in a situation where falling more than two metres is a possibility.          maintenance or demolition presents a risk of falling objects.                                                                                               Small spaces
                                                                                                                                 Contractors should ensure that appropriate lifting devices are used,          Powdered materials                                                            Some small spaces within this building will require access by
                                            Working at heights during operation and/or maintenance                               that loads are properly secured and that access to areas below the            Many materials used in the construction of this building can cause            construction or maintenance workers. The design documentation calls
                                            Cleaning and maintenance of windows, walls, roof or other components                 load is prevented or restricted.                                              harm if inhaled in powdered form. Persons working on or in the building       for warning signs and barriers to unauthorised access. These should be
                                            of this building will require persons to be situated where a fall from a                                                                                           during construction, operational maintenance or demolition should             maintained throughout the life of the building. Where workers are
                                            height in excess of two metres is possible. Where this type of activity is                                                                                         ensure good ventilation and wear Personal Protective Equipment                required to enter small spaces they should be scheduled so that
                                            required, scaffolding, fall barriers or Personal Protective Equipment                Traffic Management                                                            including protection against inhalation while using powdered material or      access is for short periods. Manual lifting and other manual activity
                                            should be used in accordance with relevant codes of practice,                        Parking of vehicles or loading/unloading of vehicles on this roadway          when sanding, drilling, cutting or otherwise disturbing or creating           should be restricted in small spaces.
                                            regulations or legislation.                                                          may cause a traffic hazard. During construction, maintenance or               powdered material.
                                                                                                                                 demolition of this building designated parking for workers and loading                                                                                      Public Access
                                            Anchorage points for portable scaffold or fall arrest devices have been              areas should be provided. Trained traffic management personnel                Treated timber                                                                Public access to construction and demolition sites and to areas under
                                            included in the design for use by maintenance workers. Any persons                   should be responsible for the supervision of these areas.                     The design of this building includes provision for the inclusion of treated   maintenance causes risk to workers and public. Warning signs and
                                            engaged to work on the building after completion of construction work                                                                                              timber within the structure. Dust or fumes from this material can be          secure barriers to unauthorised access should be provided. Where
                                            should be informed about the anchorage points.                                       Construction of this building will require loading and unloading of           harmful. Persons working on or in the building during construction,           electrical installations, excavations, plant or loose materials are present
                                                                                                                                 materials on the roadway. Deliveries should be well planned to avoid          operational maintenance or demolition should ensure good ventilation          they should be secured when not fully supervised.
                                            Slippery or uneven surfaces                                                          congestion of loading areas and trained traffic management personnel          and wear Personal Protective Equipment including protection against
                                            Floor finishes                                                                       should be used to supervise loading/unloading areas.                          inhalation of harmful material when sanding, drilling, cutting or using       Operation use of the building
                                            Where specified finishes have been selected to minimise the risk of                                                                                                treated timber in any way that may cause harmful material to be               This building has been designed as a residential building. If it, at a later
                                            floors and paved areas becoming slippery when wet or when walked on                  Busy construction and demolition sites present a risk of collision where      released. Do not burn treated timber.                                         date, is used or intended to be used as a workplace, the provisions of
                                            with wet shoes/feet. Any changes to the specified finish should be                   deliveries and other traffic are moving within the site. A traffic                                                                                          the Work Health and Safety Act 2011 or subsequent replacement Act
                                            made in consultation with the designer or, if this is not practical,                 management plan supervised by trained traffic management personnel            Volatile organic compounds                                                    should be applied to the new use.
                                            surfaces with an equivalent or better slip resistance should be chosen.              should be adopted for the work site when appropriate as determined by         Many types of glue, solvents, spray packs, paints, varnishes and some
                                                                                                                                 the builder.                                                                  cleaning materials and disinfectants have dangerous emissions. Areas          Other high risk activity
                                            The owner is responsible for the selection of surface finishes in the                                                                                              where these are used should be kept well ventilated while the material        All electrical work should be carried out in accordance with Code of
                                            pedestrian trafficable areas of this building. Surfaces should be                    Services                                                                      is being used and for a period after installation. Personal Protective        Practice: Managing Electrical Risks at the Workplace, AS/NZ 3012 and
                                            selected in accordance with AS HB 197:1999 and AS/NZ 4586:2004.                      Rupture of services during excavation or other activity creates a variety     Equipment may also be required. The manufacturer’s                            all licensing requirements.
                                                                                                                                 of risks including release of hazardous material. Existing services are       recommendations for use must be carefully considered at all times.            All work using Plant should be carried out in accordance with Code of
                                            Steps, loose objects and uneven surfaces                                             located on or around this site. Where known, these are identified on the                                                                                    Practice: Managing Risks of Plant at the Workplace.
                                            Due to design restrictions for this building, steps and/or ramps are                 plans but the exact location and extent of services may vary from that        Synthetic mineral fibre                                                       All work should be carried out in accordance with Code of Practice:
                                            included in the building which may be a hazard to workers carrying                   indicated. Services should be located using an appropriate service            Fibreglass, rockwool, ceramic and other material used for thermal or          Managing Noise and Preventing Hearing Loss at Work.
                                            objects or otherwise occupied. Steps should be clearly marked with                   (such as Dial Before You Dig), appropriate excavation practice should         sound insulation may contain synthetic mineral fibre which may be             Due to the history of serious incidents it is recommended that particular
                                            both visual and tactile warning during construction, maintenance,                    be used and, where necessary, specialist contractors should be used.          harmful if inhaled or if it comes in contact with the skin, eyes or other     care be exercised when undertaking work involving steel construction
                                            demolition and at all times when the building operates as a workplace.                                                                                             sensitive parts or the body. Personal Protective Equipment including          and concrete placement.
                                                                                                                                 Overhead power lines are near or on this site. These pose a risk of           protection against inhalation of harmful material should be used when
                                            Building owners and occupiers should monitor the pedestrian access                   electrocution if struck or approached by lifting devices or other plant       installing, removing or working near bulk insulation material.
                                            ways and in particular access to areas where maintenance is routinely                and persons working above ground level. Where there is a danger of
                                            carried out to ensure that surfaces have not moved or cracked so that                this occurring, power lines should be, where practical, disconnected or       Timber finishes
                                            they become uneven and present a trip hazard. Spills, loose material,                relocated. Where this is not practical adequate warning in the form of        This building contains finished timber products which have an applied
                                            stray objects or any other matter that may cause a slip or trip hazard               bright coloured tape or signage should be used or a protective barrier        finish. Areas where finishes are applied should be kept well ventilated
                                            should be cleaned or removed from access ways.                                       provided.                                                                     during sanding and application and for a period after installation.
                                                                                                                                                                                                               Personal Protective Equipment may also be required. The
                                            Contractors should be required to maintain a tidy work site during                   Manual tasks                                                                  manufacturer’s recommendations for use must be carefully considered
                                            construction, maintenance or demolition to reduce the risk of trips and              Components within this design with a mass in excess of 25kg should            at all times.
                                            falls in the workplace. Materials for construction or maintenance should             be lifted by two or more workers or by mechanical lifting device. Where
                                            be stored in designated areas away from access ways and work areas.                  this is not practical, suppliers or fabricators should be required to limit   Confined spaces
                                                                                                                                 the component mass.                                                           Excavation
                                            Falling objects                                                                                                                                                    Construction of this building and some maintenance on the building will
                                            Loose materials or small objects                                                     All material packaging, building and maintenance components should            require excavation and installation of items within excavations. Where
                                            Construction, maintenance or demolition work on or around this                       clearly show the total mass of packages and where practical all items         practical, installation should be carried out using methods which do not
                                            building is likely to involve persons working above ground level or                  should be stored on site in a way which minimises bending before              require workers to enter the excavation. Where this is not practical,
                                            above floor levels. Where this occurs one or more of the following                   lifting. Advice should be provided on safe lifting methods in all areas       adequate support for the excavated area should be provided to prevent
                                            measures should be taken to avoid objects falling from the area where                where lifting may occur.                                                      collapse. Warning signs and barriers to prevent accidental or
                                            the work is being carried out onto persons below.                                                                                                                  unauthorised access to all excavations should be provided.
                                            Prevent or restrict access to areas below where the work is being                    Construction, maintenance and demolition of this building will require
                                            carried out.                                                                         the use of portable tools and equipment. These should be fully                Enclosed spaces
                                            Provide toeboards to scaffolding or work platforms.                                  maintained in accordance with manufacturer’s specifications and not           Enclosed spaces within this building may present a risk to persons
                                            Provide protective structure below the work area.                                    used where faulty or (in the case of electrical equipment) not carrying a     entering for construction, maintenance or any other purpose. The
                                            Ensure that all persons below the work area have Personal Protective                 current electrical safety tag. All safety guards or devices should be         design documentation calls for warning signs and barriers to
                                            Equipment.                                                                           regularly checked and Personal Protective Equipment should be used            unauthorised access. These should be maintained throughout the life of
                                                                                                                                 in accordance with manufacturer’s specification.                              the building. Where workers are required to enter enclosed spaces, air
                                                  Building components                                                                                                                                          testing equipment and Personal Protective Equipment should be                               /Users/benthornton/Dropbox/My Mac (Bens-iMac)/Documents/Cadfiles/2001 -
                                                                                                                                                                                                                                                                                                                                               Kirkman/Archicad/20092021/2001.pln
                                                  During construction, renovation or demolition of this building, parts of       Hazardous substances                                                          provided.
                    sbt designs pty ltd t/a
                                                  the structure including fabricated steelwork, heavy panels and many            Asbestos               lot no.                                           --
                    Skale Building Design
                                                  other components will remain project       Residence
                                                                                  standing prior to or after supporting parts    This site currently has an existing home to be demolished. The
                                                                                                                                                                                                                    B
                                                                                                                                                                                                             Small spaces
                                                                                                                                                                                                                          BA Issue                                                                             8/2/22
                                                                                                                                                                                                                                                                                                                        project number
                    Mobile: 0412 025 657
                                                  are in place. Contractors should
                                                                               for ensure that   temporary
                                                                                             David       & JanbracingKirkman
                                                                                                                      or other   demolition works are toplan   no. and detailed by others. The builder --Some small spaces
                                                                                                                                                          be designed
                                                                                                                                                                                                                    P1    BA Issue
                                                                                                                                                                                                                                   within this building will require access by
                                                                                                                                                                                                                                                                                                              13/8/21
                                                                                                                                                                                                                                                                                                                        2001
skale
                                                  required support is in place at all times when collapse which may injure       should check and, if necessary,   take appropriate action before            construction or  maintenance    workers. The design documentation calls
                    skale.com.au                  persons in the area is a possibility.  U2/16 Barbados Court                                           drawn
                                                                                                                                 commencement of works to ensure that the removal of any existing
                                                                                                                                                                                                         BT
                                                                                                                                                                                                             for warning signs and barriers to unauthorised access. These should be
                                                                                                                                                                                                                                                                                                                        drawing number
                    [email protected]
  building design   A.C.N. 123 976 296 QBCC: 1143 609                          at        Noosa Sound
                                                  Mechanical lifting of materials and components during construction,
                                                                                                                                                        scale
                                                                                                                                 hazardous materials that            (A3) on the site. Should any 1:100maintained
                                                                                                                                                           may be present                                          Rev throughout
                                                                                                                                                                                                                          Details     the life of the building. Where workers are                               Date    1.1                   B            © Skale Building Design
                                                                                                                                 remains of hazardous materials be discovered the builder shall to steps     required to enter small spaces they should be scheduled so that
                                                  maintenance or demolition presents a risk of falling objects.
Log in to download the original file

Architectural Plans 08.02.22.pdf · 7.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.