                                              Officer:            Tracy Jones
                                              Direct Telephone:   (07) 5449 5228
                                              Response Address:   PO Box 141, Tewantin QLD 4565
                                              Email:              [email protected]
                                              Our Reference:      2008/200
                                              Your Reference:
6 August 2008

Middap & Ditchfield Pty Ltd
Cnr Mary & Thomas Streets
NOOSAVILLE QLD 4566




Dear Madam

                            Negotiated Decision Notice
                                      Integrated Planning Act 1997

I refer to your application and the representations you made in respect to the Decision Notice. On 5
August 2008 Council decided your representations.
Details of the negotiated decision are as follows:

1        APPLICATION DETAILS

    Application No:           2008/200
    Street address:           15 Duke Street, Sunshine Beach
    Real property             Lot 201 RP 48113
    description:
    Planning Scheme:          The Noosa Plan

2        DECISION DETAILS
Council on 24 July 2008 decided to issue the following type of approval: -
        Preliminary Approval for Operational Works - Landscaping, Carparking & Access, Frontage
         Works, Stormwater Drainage, Site Civil Works and Erosion & Sediment Control
In relation to representations, Council on 5 August 2008 decided to:
A.      Grant a Development Permit subject to the conditions contained in the Preliminary Approval
        issued on 25 July 2008 with an amendment to Condition 12
B.      Agree to delete Condition 1
C.      Issue a Negotiated Decision Notice

3        RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

Landscaping
1.       Deleted.
                                                                                                  1 of 8
Full text of the other 7 pages

Page 2

                                                                                         2008/200



2.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are numbered, titled and dated:
      Plan     /      Rev.        Plan / Document Name                                 Date
      Document
      No.
                                  Planting Plan – Winter & Co. Pty Ltd                 12/3/08
3.    All manholes, inspection pits and grates are to be raised to finished surface levels and kept
      free of cover and be visible at all times to ensure prompt access in case of emergency.
4.    The landscape construction is to be implemented in accordance with the amended landscape
      plan, planting schedule and horticultural industry best practices.
5.    All trees must be planted a minimum of 1 metre from all services.
6.    All trees 45 litre and greater must be securely tied and staked to assist their growth during the
      establishment period.
7.    All native plant species located in group plantings shall not be subjected to any hedging
      maintenance regimes.
8.    The density of planting must achieve the set out requirements as detailed on the approved
      landscape plan.
9.    The applicant must ensure that all landscaping treatment does not unduly restrict/prevent
      access to service meters within the site.
10.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents in the vicinity of the development.
11.   The requirements of this development approval are to be effected, prior to the use of the
      relevant premises. Council reserves the right to call upon the bond or guaranteed sum
      applicable to the overall site to effect compliance with conditions.
12.   This Development Permit lapses if the development has not happened by 5 August 2010,
      unless application to extend the currency is approved by Council.
Carparking, access, frontage works, stormwater, drainage, site civil works, erosion & sediment
control
13.   The development shall be carried out in accordance with the approved plans listed below or as
      modified herein.
14.   Copies of the approved drawings, duly signed by the Consultant Registered Professional
      Engineer, Queensland (RPEQ) shall be provided to Council’s Construction Technical Officer at
      the “pre start” meeting.
15.   The access driveway, turning area and visitor car-space shall be constructed so that surface
      runoff is directed (falls) to the grated drain and Gross Pollutant Trap (GPT) at the Duke Street
      frontage.
16.   The grated drain and GPT are to be constructed wholly within the subject site.
17.   Roof and surface runoff connection to Council’s drainage system shall be as shown on
      drawing no. 1899-5 by Construction Hydraulic dated 17/04/08.
18.   A concrete footpath 1.5 metres wide shall be constructed across the full frontage of the
      development. The footpath shall have a slip resistant surface. The alignment shall be
      determined on site with Council’s Construction Technical Officer. The expansion joints in any
      footpath shall be “saw cut”, not trowel jointed.


                                                                                              2 of 8

Page 3

                                                                                       2008/200



19.   Council’s Construction Technical Officer (ph 0410 512 505) shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting prior to the
      commencement of works.
20.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
21.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
22.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ).          The consulting engineers are responsible for arranging all
      inspections, with Council’s Construction Technical Officer or nominated staff. Council’s
      Construction Technical Officer shall provide an inspection form for signing off by the Engineer
      at appropriate stages of construction, during on-site meetings. Construction Technical Officer
      will also sign the form at each stage when conditions required have been satisfied.
23.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
24.   Council standards shall apply to these works unless otherwise modified herein.
25.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
      property or facility at its cost and to the satisfaction of the Manager Land Development.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request the Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to the Council prior to the
      commencement of the use.
      In the case of any emergency the Council shall be entitled to rectify such damage at the cost
      of the Applicant, such cost being paid prior to the commencement of the use.
26.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
27.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by the Manager, Land Development or his
      nominee.
28.   All signage, including that for safety during construction, shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
29.   Safe pedestrian access on Duke Street in the vicinity of the development shall be maintained
      at all times. Should footpath / road closures be necessary to carry out construction works,
      Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the
      proposed closure.


                                                                                         3 of 8

Page 4

                                                                                         2008/200



30.    Sediment and erosion control measures must be in place prior to works commencing. If such
       measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
       fines can be issued if sediments from the site are found to enter or have the potential to enter
       Council’s stormwater system or natural waterways. Although the sediment and erosion control
       measures have been approved on drawing no. 1899-6, Council’s Manager, Land
       Development, may request further controls to be installed should approved measures be
       inefficient.
31.    These works are also to be in compliance with the relevant conditions of Development Permit
       No. 2007/1045.
32.    Notwithstanding that Council has checked the plans with due care, where it is found during
       construction that variations from Council's standards exist, then Council standards shall apply.
Approved Plans
The approved plans for this development approval are listed in the following table:
 Plan / Document No.       Rev.     Plan / Document Name                      Date
 0724 WD 100               B                                                  31.01.08
                                    Working Drawings Operational Works
                                    Site Plan - Middap Ditchfield Pty Ltd
 17273 – OW1               A                                                  20.03.08
                                    Operational Works & Drainage – SCG
                                    Consulting Engineers
 17273 – OW2               A                                                  20.03.08
                                    Carparking and Driveway Plan – SCG
                                    Consulting Engineers
 1899-1                    A                                                  30-04-08
                                    General    Notes     &    Legend      –
                                    Construction Hydraulic)
 1899-5                                                                       17-04-08
                                    Stormwater Operational      Works     –
                                    Construction Hydraulic)
 1899-6                                                                       17-04-08
                                    Sediment & Erosion Control Plan –
                                    Construction Hydraulic)

5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency        Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.

7      ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:


                                                                                           4 of 8

Page 5

                                                                                            2008/200



1.      Should any changes or modifications to the approved plans be required as a result of
        construction constraints, a Change to an Existing Approval Application under the Integrated
        Planning Act must be made. Amended plans clearly indicating the changes must be lodged
        with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8      PROPERTY NOTES

Not applicable

9      PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable

10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit               Subject of the required Development Permit
 required
 Nil

11     SELF ASSESSABLE CODES
Not applicable

12     SUBMISSIONS
Not applicable

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable
14     RIGHTS OF APPEAL

You have continuing appeal rights in respect of Council’s decision on your application. Refer Section
4.1.27. of the Integrated Planning Act 1997.

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision, electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.



                                                                                              5 of 8

Page 6

                                                  2008/200



DECISION NOTICE HISTORY
 Original Decision Notice issued 24 July 2008.
 Negotiated Decision Notice issued 5 August
  2008 with amendment to Condition 12.
Yours faithfully,




Tracy Jones
SENIOR PLANNING OFFICER




                                                    6 of 8

Page 7

                                                                                                  2008/200


                                                Appeal Rights
                                               INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                     (5) If an application is processed under section
Planning Act (Chapter 4).                                     6.1.28(2), appeal rights for submitters for the
                                                              application are available only for the aspects of the
Division 8 - Appeals to court relating to                     development that would have required public
development applications                                      notification under the repealed Act.
Appeals by applicants                                               (6) If an application involves assessment against a
4.1.27.(1) An applicant for a development application         concurrence agency code, appeal rights for
may appeal to the court against any of the following-         submitters for the application are not available against
(a) the refusal, or the refusal in part, of a development     the part of the approval that represents the
    application;                                              concurrence agency’s response for the code.
(b) a matter stated in a development approval,                Appeals by advice agency submitters
    including any condition applying to the                   4.1.29.(1) An advice agency may, within the limits of
    development, and the identification of a code             its jurisdiction, appeal to the court about the giving of
                          1
    under section 3.1.6;                                      a development approval for a development
(c) the decision to give a preliminary approval when a        application if-
    development permit was applied for;                       (a) the development application involves impact
(d) the length of a currency period;                                assessment; and
(e) a deemed refusal.                                         (b) the advice agency told the applicant and the
                                                                    assessment manager to treat its response to the
    (2) An appeal under subsection (1)(a) to (d) must               application as a submission for an appeal.
be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or                (2) The appeal must be started within 20 business
negotiated decision notice is given to the applicant.         days after the day the decision notice or negotiated
                                                              decision notice is given to the advice agency as a
    (3) An appeal under subsection (1)(e) may be              submitter.
started at any time after the last day a decision on the
matter should have been made.                                 Appeals for matters arising after approval given
                                                              (co-respondents)
Appeals by submitters
                                                              4.1.30.(1) For a development approval given for a
4.1.28.(1) A submitter for a development application          development application, a person to whom any of the
may appeal to the court about-                                following notices have been given may appeal to the
(a) the giving of a development approval, including           court against the decision in the notice-
    any conditions (or lack of conditions) or other           (a) a notice giving a decision on a request for
    provisions of the approval; or                                  extension of the currency period for an approval;
(b) the length of a currency period for the approval.         (b) a notice giving a decision on a request to make a
    (2) The appeal must be started within 20 business               minor change to an approval.
days (the “submitters appeal period”) after the day                 (2) The appeal must be started within 20 business
the decision notice or negotiated decision notice is          days after the day the notice of the decision is given
given to the submitter.                                       to the person.
    (3) If a person withdraws a submission before the               (3) Subsection (1)(a) does not apply if the
application is decided, the person may not appeal the         approval resulted from a development application
decision.                                                     (superseded planning scheme) that was assessed as
    (4) If an application involves both impact                if it were an application under a superseded planning
assessment and code assessment, appeal rights for             scheme.
submitters are available only for the part of the                   (4) Also, a person who has made a request
application involving impact assessment.                      mentioned in subsection (1) may appeal to the court
                                                              against a deemed refusal of the request.
                                                                    (5) An appeal under subsection (4) may be started
1                                                             at any time after the last day the decision on the
   Section 3.1.6 (Preliminary approval may override local     matter should have been made.
planning instrument)
                                                                                                     7 of 8

Page 8

                                                                                             2008/200



Division 9 - Appeals to court about other matters          Appeals by applicants
Appeals for matters arising after approval given           4.2.9(1) An applicant for a development application
(no co-respondents)                                        may appeal to the Building and Development Tribunal
4.1.31.(1) A person to whom any of the following           against any of the following-
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change      (a) the refusal, or the refusal in part, of a development
    or cancel a condition of a development approval.           application;
                                   2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development          (b) a matter stated in a development approval,
    approval.                                                  including any condition applying to the
    (2) The appeal must be started within 20 business          development, and the identification of a code
                                                                                    3
        days after the day the notice of the decision is       under section 3.1.6;
        given to the person.                               (c) the decision to give a preliminary approval when a
    (3) Also, a person who has made a request                  development permit was applied for;
        mentioned in subsection (1)(a) may appeal to       (d) the length of a period mentioned in section 3.5.21
        the court against a deemed refusal of the              currency period;
        request.
                                                           (e) a deemed refusal.
    (4) An appeal under subsection (3) may be started
                                                               (2) An appeal under subsection (1)(a) to (d) must
        at any time after the last day the decision on
                                                           be started within 20 business days (the “applicant’s
        the matter should have been made.
                                                           appeal period”) after the day the decision notice or
Appeals against decisions to change approval               negotiated decision notice is given to the applicant.
conditions under the repealed Act
                                                               (3) An appeal under subsection (1)(e) may be
4.1.33A.(1) A person who is dissatisfied with a            started at any time after the last day a decision on the
decision made on an application to change the              matter should have been made.
conditions attached to an approval given under
                                                           The Registrar for the Building and Development
section 2.19(3)or section 4.4 of the repealed Act may
                                                           Tribunal may be contacted at the website
appeal to the court against-
                                                           http://www.localgovernment.qld.gov.au/
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises or
the erection of a building or other structure permitted
by the planning scheme may appeal to the court
against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
For Building Works Only
Rights of appeal conferred by Section 4.2.9 of the
Integrated Planning Act 1997 as follows:
Division 3 – Appeals to tribunals relating to
development applications

2
  Section 6.1.44 (Conditions may be changed or cancelled   3
by assessment manager or concurrence agency in certain        Section 3.1.6 (Preliminary approval may override local
circumstances)                                             planning instrument)
                                                                                                 8 of 8

Used in these records

About this file

File size
58 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice - 010.2008.00000200.001 [As Published].pdf · 58 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.