2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered, titled and dated:
Plan / Rev. Plan / Document Name Date
Document
No.
Planting Plan – Winter & Co. Pty Ltd 12/3/08
3. All manholes, inspection pits and grates are to be raised to finished surface levels and kept
free of cover and be visible at all times to ensure prompt access in case of emergency.
4. The landscape construction is to be implemented in accordance with the amended landscape
plan, planting schedule and horticultural industry best practices.
5. All trees must be planted a minimum of 1 metre from all services.
6. All trees 45 litre and greater must be securely tied and staked to assist their growth during the
establishment period.
7. All native plant species located in group plantings shall not be subjected to any hedging
maintenance regimes.
8. The density of planting must achieve the set out requirements as detailed on the approved
landscape plan.
9. The applicant must ensure that all landscaping treatment does not unduly restrict/prevent
access to service meters within the site.
10. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents in the vicinity of the development.
11. The requirements of this development approval are to be effected, prior to the use of the
relevant premises. Council reserves the right to call upon the bond or guaranteed sum
applicable to the overall site to effect compliance with conditions.
12. This Development Permit lapses if the development has not happened by 5 August 2010,
unless application to extend the currency is approved by Council.
Carparking, access, frontage works, stormwater, drainage, site civil works, erosion & sediment
control
13. The development shall be carried out in accordance with the approved plans listed below or as
modified herein.
14. Copies of the approved drawings, duly signed by the Consultant Registered Professional
Engineer, Queensland (RPEQ) shall be provided to Council’s Construction Technical Officer at
the “pre start” meeting.
15. The access driveway, turning area and visitor car-space shall be constructed so that surface
runoff is directed (falls) to the grated drain and Gross Pollutant Trap (GPT) at the Duke Street
frontage.
16. The grated drain and GPT are to be constructed wholly within the subject site.
17. Roof and surface runoff connection to Council’s drainage system shall be as shown on
drawing no. 1899-5 by Construction Hydraulic dated 17/04/08.
18. A concrete footpath 1.5 metres wide shall be constructed across the full frontage of the
development. The footpath shall have a slip resistant surface. The alignment shall be
determined on site with Council’s Construction Technical Officer. The expansion joints in any
footpath shall be “saw cut”, not trowel jointed.
2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - 010.2008.00000200.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.