Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2022-10-24 General Committee Meeting- Item 7 - Attachment 1 - Noosa Oyster Ecosystem Restoration Project - Final Report (1)

of 73

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

    •   Developed and distributed the Oyster Chronicle news circular. Direct circulation was to over 100 locally engaged
        stakeholders on the Noosa mailing list.

    •   Reached 21,800,727 people through mainstream media and 7814 people through social media.

    •   Supported a PhD student from Griffith University who is studying the diversity of oysters and their settling patterns
        in the Noosa River estuary.

    •   Secured an official name for Noosa’s oyster reefs from the Kabi Kabi elders – the ‘Huon Mundy Reefs’.

    •   Developed an oyster reef interpretive sign in partnership Kabi Kabi applicants and NC.

    •   Held the project ‘Shellebration’ launch event to celebrate the project’s achievements and partnerships (7th
        September 2022 at Tewantin)


Project achievements against deliverables
Since the start of the project, the following achievements have been made, as measured against the contracted deliverables
and outcomes outlined in the Agreement (Table 2).

Table 2: Project deliverables, outcomes, and achievements

 Deliverables            Measurable outcomes                    Status         Achievement
 (A1.1) A Technical      1. Technical Advisory Group with       Achieved       Terms of Reference (ToR) for the TAG
 Advisory Group          TOR established and at least one                      finalised
 (TAG) is established    meeting held
 to provide project                                                            Inaugural meeting held 13 May 2020.
 oversight. This will
 include a clear term                                                          TAG meetings were held as required
 of reference (ToR)                                                            and TAG members engaged on a
 and consist of                                                                regular basis out of session to advice
 representatives from                                                          on specific aspects of the project (e.g.,
 key stakeholders                                                              biosecurity, permits) and to review
 (NC, TNC, Kabi Kabi                                                           draft project reports.
 and at least two
 other independent       2. Evidence of Kabi Kabi                              Kabi Kabi expressed a desire not to be
 parties).               involvement                                           on the TAG but to be kept up to date.

                                                                               Kabi Kabi liaison officer and applicant,
                                                                               Brian Warner met with, as required.

                                                                               Kabi Kabi elder, Fred Palin, was
                                                                               regularly consulted on project progress
                                                                               and engagement pathways with Kabi
                                                                               elders.

                                                                               Partnership with Kabi Kabi to name the
                                                                               oyster reefs and prepare an
                                                                               interpretive signage at Tewantin were
                                                                               secured with special help from Fred
                                                                               Palin and Melissa Bond.

                                                                               See ‘Project Highlights’ in this report

                                                                                                                           11
Log in to download the original file

2022-10-24 General Committee Meeting- Item 7 - Attachment 1 - Noosa Oyster Ecosystem Restoration Project - Final Report (1)(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.