Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2022-10-24 General Committee Meeting- Item 7 - Attachment 1 - Noosa Oyster Ecosystem Restoration Project - Final Report (1)

of 73

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

(A1.2) Appointment       3 Project Manager appointed           Achieved   Craig Bohm appointed by TNC. Position
of dedicated project                                                      commenced 29 January 2020.
manager who is a
marine biologist with
extensive project
management
experience, for the
term of the
Agreement.
(A1.3) A Project         4. Project Implementation Plan        Achieved   The project implementation plan was
Implementation Plan      endorsed by TAG and submitted to                 endorsed by NC as the ‘Project
detailing at a           Noosa Council                                    Management Plan’ at its Ordinary
minimum:                                                                  Meeting held 16 July 2020. The Project
A detailed risk          5. Project Implementation Plan                   Management Plan included a detailed
assessment               presented to Noosa Council and its               risk assessment, Communications and
associated with the      officers for approval                            Media Plan and Monitoring, Evaluation
project.                                                                  and Reporting (MER) Plan.
A communications
and media plan,                                                           The MER Plan was then reviewed by an
outlining media                                                           independent consultant and the
protocols,                                                                recommendations responded to and
opportunities, and                                                        adopted by TNC.
the role of TNC and
NC.                                                                       See Annexes 23 & 24
A monitoring,
evaluation and
reporting plan which
identified ecological
and social
monitoring
programs, how they
will be reported on
and how this will fed-
back into the project.

(A1.4) Participation     6. Participate in at least 3 public   Achieved   - Over 100 bilateral meetings with local
and delivery of public   presentations/forums in the first 9              groups (during COVID19 period)
education and            months
engagement forums                                                         See Annex 3 (pgs. 17-21)
and media                7. Participate in at least 6 public
statements               presentations/forums in the 2nd and              - 3 Public Information Sessions (2020)
                         3rd financial years
                                                                          See Annex 27
                         8. A minimum of 3 media
                         statements throughout duration of                - Noosa community engagement
                         the project                                      workshop (2020)

                                                                          See Annex 5 (pgs. 20-23)

                                                                          Presentations at:

                                                                                                                     12
Log in to download the original file

2022-10-24 General Committee Meeting- Item 7 - Attachment 1 - Noosa Oyster Ecosystem Restoration Project - Final Report (1)(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.