2022-10-24 General Committee Meeting- Item 7 - Attachment 1 - Noosa Oyster Ecosystem Restoration Project - Final Report (1)
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Noosa Construction
News page FINAL
NC Works In
Progress (WIP)
page
38
Noosa Construction - /
News page FINAL ae a ae ~ ; a Sle al ,
ed a Stel - 7s a ~ a pry
Ase Rae Te A ee ‘ aa >, > a ,
NC Works In athe Siem ee -
cq age : a ee \ . > dai - r
Progress (WIP) tac Bi eer ea ee eP LO) LER ia SS mee a
page . 7" ~ -- Ei ; PEP. r : -
: tae wens end
Oe aes wa
Project news
July 2022
Noosa River Oyster Ecosystem Restoration
Project summary Location of works
The Nature Conservancy, Noosa Shire Site 1: Goat Island - centre of the southern
Council and the Noosa community are shoreline, landward of the formal moorings.
rebuilding oyster reefs in the Noosa River. Site 2: Tewantin shoreline - upstream of the
Oyster reefs were lost from the Noosa River boat ramp below the council chambers.
cat ame a ago and Soe ae Sites 3 and 4: Noosa Sound — east and west
in helping maintain health, a '
resilience of the Noosa River. Oyster reefs —_—ae s
were also culturally important to Noosa's Locally sourced rock and clean oyster shell
traditional custodians, the Kabi Kabi Nation, is transported to the project load out site at
who also wishes to see them restored. the end of Hilton Esplanade, Tewantin|
This collaborative project is supported by At the load out site, the rock and shell are
the Thomas Foundation, the Australian loaded onto a barge and transported to the
Marine Conservation Society, and the restoration sites.
Australian Government's Reef Builder The contractor then deploys the rock and
program. shell onto the restoration sites in strict
Investigations and Options adherence to the design specifications.
The Nature Conservancy worked closely Timing seed career ef werhs
with its local partners, project's technical The construction work is due to begin on 27
advisory group, coastal engineers, and July and will continue for six weeks.
< -peeamombeabcueat vest meot preenegitmel cen: The contractors will aim to minimise the
In the construction phase of this project, duration of the construction process by :
marine contractors deploy the rock working continuous days during this period.
foundations onto the riverbed in special Next Steps
configurations to create oyster reef patches. ‘ .
The contractor uses a barge and excavator, Post construction, the sites will be clearly
with oversight from specialist engineers, to marked, mapped, and monitored by
do this work. scientists.
Permits Further information
All works are undertaken in strict adherence Please contact us at queensiand@inc org
with state and local laws and the required Find out more about the project here:
NOOSA COl NCI . Bow t4 i 323 ¢ Tipe , ,
TEWANTIN OLD 4565 : vai.) ae eee i
38See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.