Oyster Chronicle
A special edition of
the Oyster Chronicle
was distributed to
the Noosa
stakeholder mailing
list of over 100
individuals and
groups to advise
them what to expect
from the
construction process.
Signage
Signage was
installed at the load
out site on Hilton
Esplanade for
public information
about the
construction
activities. The same
sign is displayed on
the push vessel that
is operating with
the barge during
construction.
See Annex 38
Aids to navigation
Aids to navigation
were designed in
partnership with NC
and MSQ.
Aids to navigation
were placed at each
restoration site
(therefore two at
each site) to advise
river users to stay
clear of the works.
39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.