Acid Sulfate Report
Attached to the e-mail Additional Items for Information Request - MCU17/0076 & OPW17/0224.
25 EDWARD STREET, NOOSAVILLE PROPOSED DUPLEX DEVELOPMENT 5.0 GEOTECHNICAL ASSESSMENT 5.1 Earthworks 5.1.1 Site Preparation Existing fill (presumably uncontrolled) and organic rich topsoil should be stripped and set aside. Stripping depths for topsoil will typically range from 100 mm to 200 mm, to remove organics bearing soil. This material must not be re-used as structural fill, however may be retained on site for later landscaping use, if required. Fill material below topsoil to a depth of 0.5 m BGL should also be removed, but may be reused where free of deleterious matter and compacted under controlled conditions. Subgrade areas should be ‘proof rolled’ using a fully laden water cart or minimum 4 tonne roller in order to identify any ‘soft spots’. Treatment of ‘soft spots’ may involve excavation and replacement with select fill or tyning, appropriate moisture adjustment and compaction. Proof rolling should be carried out in the presence of an experienced engineer. 5.1.2 Excavations Excavations are expected to be within mostly loose to medium dense sands, and should be achievable using small excavator(s) (3 to 5 tonne). The groundwater table was recorded during subsurface investigation at depths between 1.2 m and 1.4 m BGL. Therefore, some temporary excavations, such as for services, may extend below the groundwater table. Temporary shoring of trenches, in combination with isolated (short term) dewatering, may therefore be required. This could be achieved using trench shields in combination with dewatering well points (connected to submersible pumps). The extent of dewatering will need to be carefully managed to ensure that there are no adverse impacts on adjoining structures or ASS. 5.1.3 Trafficability After stripping, the subgrade is expected to comprise loose to medium dense sand. Such materials should provide reasonable trafficability, however placement of rock fill (say 150 mm thick layer of 75 mm ‘ballast’) may be required to maintain subgrade stability for any heavily trafficked areas. Specific design will need to be carried out to determine working platform requirements for any heavy plant (e.g. cranes or piling rigs), and a thicker rock fill platform may be required than recommended above. 5.1.4 Filling Due to the close proximity of the neighbouring houses, and presence of underlying loose sand, it is essential that earthworks be carried out in a fashion to minimise ground vibrations. No vibratory equipment should be used. It would be prudent to conduct a dilapidation survey of nearby structures prior to construction in order to establish a ‘baseline’ of structural condition. Filling is expected to be up to 1.0 m deep and will need to be imported to site. Any fill required to form the design platform levels should comprise materials which meet the following specifications: ▪ Minimum CBR value of 10% ▪ Maximum ‘fines’ content (percent passing 0.075 mm sieve) of 10% ▪ Plasticity index not exceeding 15% Note: To enable minimum compactive effort without the use of vibration, it is our recommendation that the imported fill comprise ‘roadbase’ type material. All fill should be compacted at moisture contents within the range of ±2% of optimum moisture content for Standard Compaction. Fill particles greater than 100 mm must be excluded. Fill should be placed in 25 August 2017 Report No. 17265-001-Rev0 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.