Original source · versioned page text
Acid Sulfate Report
Attached to the e-mail Additional Items for Information Request - MCU17/0076 & OPW17/0224.
25 EDWARD STREET, NOOSAVILLE PROPOSED DUPLEX DEVELOPMENT Text Figure 7: Footing depth required to prevent undermining Footing bases must be cleaned following mechanical excavation to expose undisturbed materials over the full base area. It is recommended that footings be inspected by an experienced engineer prior to placement of steel reinforcement to confirm allowable bearing pressures and cleanliness of excavations. If any soil conditions encountered during construction are found to differ from those notes in the geotechnical investigation, Tectonic should be notified immediately and an inspection carried out to determine if changed to footing design are required. 5.3 Retaining Wall Design Design for retaining walls could be carried out based on the parameters listed in Table 2. These values do not include allowance for hydrostatic pressures nor transient (e.g. construction) or adjacent footing loadings. Table 2: Retaining Structure Design Parameters Lateral earth pressure coefficients Unit Friction Retained material weight angle Ka Ko (t/m3) (Degrees) Kp (Cantilever wall) (Non-yielding wall) Loose Sand 1.8 27 0.4 0.5 2.6 Medium Dense (or Denser) Sand/Gravel 1.9 34 0.3 0.4 3.5 (e.g. future controlled fill) 5.4 Permanent Drainage Adequate site drainage must be installed to ensure that surface water runoff is directed away from pavements and footings. Subsurface drainage must be installed behind retaining walls in order to prevent the development of hydrostatic pressure (e.g. slotted ‘aggi’ pipe wrapped in filter ‘sock’ placed in gravel backfill). Subsurface disposal/infiltration of stormwater is not recommended due to the potential to affect the performance of buildings footings and pavements. All excess stormwater should be piped or channeled towards the local drainage system along Edward Street. 25 August 2017 Report No. 17265-001-Rev0 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.