Original source · versioned page text
Town Planning Report
Attached to the e-mail IDAS Form & Planning Report email 1 of 3 MCU17/0024.
Proposal Report Proposed Material Change of Use of Premises for an Entertainment and dining business Type 1 Food & Beverages and Type 2 Recreation, amusement & fitness (extensions and alterations to a Surf Club) over land at 4 The Esplanade, Sunshine Beach and described as lot 126 on CP845336 and Lot 5 on SP269274 Applicant: Sunshine Beach Surf Life Saving Club Table 14-8 For all Business Uses Specific Outcome Probable Solutions Proposal Response Electricity infrastructure O18 The development does not S18.1 No solution provided Existing supply adequate for adversely impact on existing or future development on site. Low energy electricity supply infrastructure; AND lighting will be used and solar panels provided. O19 All uses and works maintain an S19.1 Development for uses adjacent Not applicable adequate safe distance from electrical to or within 50m of an existing infrastructure including substations, electricity substation incorporates overhead powerlines, power poles and noise attenuation measures to transformers. mitigate noise impacts; AND S19.2 Buildings and structures Complies (including swimming pools, sheds, tennis courts and outbuildings) are not constructed under overhead electricity transmission lines, or within electricity easements. Noise O20 Development is designed and No solution provided Design of building has given careful sited to avoid noise emissions that consideration to the surrounding area. unreasonably diminish the amenity of Existing open deck area to the east the area or surrounding uses. has been maintained whilst the open deck to the west and opening to the north, west and south have been minimized. Mechanical plant and equipment and storage areas S21.1 Mechanical plant and Existing and new mechanical plant to O21 Mechanical plant and equipment equipment are— be screened from adjoining areas. (including air conditioning equipment) a) located more than 2m from any These areas have been integrated into and storage areas are designed and property boundary; the roof line and overall form of the located to— b) where located at ground level, building so as not to be visible to the a) avoid adverse visual impacts when screened by fencing 1.5m in height or surrounding area. viewed from the street and adjoining dense vegetation of at least 1.5m in properties; and width incorporating grouped trees and b) visually integrate with the building shrubs with maximum separation design. distance of 1m measured from the centre of the tree or scrub; and c) are visually integrated into the line and plane of the building and roof design and do not project beyond the height or width of the building when viewed from the street and adjoining properties; AND S21.2 For Industrial business and Not applicable Retail business Type 3, materials stored outside of a building do not exceed 4m in height or half the height of the on-site buildings whichever is the greater. Safety and security O22 All property boundaries are S22.1 Boundaries are identified by Existing boundaries clearly identified clearly identifiable with public and such means as - by existing building form and fencing private spaces clearly defined. a) fencing; or b) changes in surface materials or levels; or c) landscape treatments; AND S22.2 Loading and storage areas are Deliveries to the Surf Club are well lit or can be locked after hours. currently undertaken at the front of the club and along the side access road. O23 All premises and access routes S23.1 All premises are identified by are clearly identifiable to all persons, the provision of the street number in a Complies particularly emergency services prominent location, preferably near the personnel. site entry, (i.e. on the kerb or letterbox or by signage on the building or site). O24 All building entries are designed S24.1 The number of entrances and to be obvious and easily identifiable. exits are limited and main building Complies – works proposed as part of entrances/exits are located at the front the development include an upgrade of the site, in view of the street. Where of the forecourt and entrance area as this is not possible, due to site or well as the provision of a new existing building constraints, a well pedestrian footpath to the beach defined path is provided to the access. At present there is no defined martoo consulting - Town Planning + Urban Designers + Development Managers 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.