Council archive · source document
Town Planning Assessment Report · MCU25/0087
service area, an adequate, reliable, tank available for
safely located and freely accessible firefighting purposes with
water supply is provided for fire an onsite water volume of
fighting purposes, which is in not less than 5,000 litres;
addition to day to day water supply. and
e. a water supply outlet pipe
50 millimetres in diameter
and fitted with a standard
fire brigade fitting
connected to the water
supply (other than where
the water supply is in a
swimming pool or dam).
Editor’s Note — Water supply capacity
for firefighting purposes is in addition
to water supply capacity for household
use.
Flood Hazards AO16.1 Where the development is Not applicable
PO16 Development is designed located in the Flood Hazard Area as The site is not mapped in the
and sited to ensure risk to people shown on Flood Hazard Overlay Flood Hazard Area.
and property from flooding is Map in Schedule 2, the finished
avoided or minimised. floor level of habitable rooms is at
least 300 millimetres above the
Defined flood event (DFE).
OR
AO16.2 Where the DFE has not Not applicable
been modelled for the area, the
finished floor level of habitable
rooms is at least 500 millimetres
above the highest recorded flood.
Editor's Note—The QDC mandatory
provisions MP3.5 also apply to the
construction of buildings in flood hazard
areas.
Major Electricity Infrastructure AO18.1 Development including any Not applicable
& Substations sensitive land uses is at least: The site is not mapped as
PO18 Development is sufficiently a. 50 metres from a containing major electricity
separated from major electricity transmission substation; infrastructure or substations.
infrastructure and substations to b. 10 metres from any other
minimise the likelihood of nuisance substation; and
or complaint.
c. 30 metres from a
transmission line easement.
AO18.2 Habitable buildings are not Not applicable
located within an easement for a The site is not mapped as
distribution line. containing major electricity
28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.