12
13 X 20 REFER DETAIL MINIMUM TO LIMIT THE EXPOSURE OF SOIL TO RAIN-DROP IMPACT AND OTHER
10
PROPOSED SILT FENCE. 14
FORMS OF WIND/STORMWATER EROSION.
8 15 17 DRG ESC02
REFER DETAIL DRG ESC02 16
X
X
21
11. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS
EX
5
1
7 7
X 19 PROPOSED PIT
STANDARD SPECIFICATION.
W
9 6
6
10
18 PROTECTION.
X
78
13 X REFER DETAIL
20
D
11 12
S
14 DRG ESC02
21
9
9
6 NOTE: NO STORMWATER CONNECTION 15
16 17
| |
TEMPORARY SEDIMENT BASIN NOTES
| |
S
X |
| |
21
S
>
TO RIC UNTIL SITE IS FULLY
|
X
19
EX
|
| |
5
6
1
|
SEDIMENT BASIN TO BE CONSTRUCTED WITH A MINIMUM 300mm
8
18
|
X
| |
20
STABILIZED AND ENGINEER'S WRITTEN
>
|
10 20.5
|
|| NON-DISPERSIVE LAYER OF SOIL TO ALL BANKS.
|
|
| TEMPORARY CONSTRUCTION
|
9
APPROVAL TO CONNECT IS ISSUED. 7 13
| | | | | | |
|
11 |
>
12 X
X
14 17 ACCESS. REFER DETAIL DRG ESC02
6
15
THE SEDIMENT BASINS ARE TO BE A “WET” TYPE. ALL DECANTING TO BE VIA
20
7
16 19.5
1
5
X 19 X
W
18 PUMPING.
W
.5
18
X THE WATER CONTAINED IN THE BASIN SHOULD BE DOSED WITH A
7 10
OU
T
1
13
PROPOSED SILT FENCE. 14 FLOCCULANT (GYPSUM) FOLLOWING RAINFALL EVENTS & TESTED PRIOR TO
8
11 12
17
15 16
7 REFER DETAIL DRG ESC02 RELEASE. WATER SHALL NOT BE RELEASED UNTIL COUNCIL WATER QUALITY
PARAMETERS ARE ACHIEVED. THE BASIN SHALL THEN BE PUMPED DRY
9
APPROX. 36 HOURS AFTER FILLING IN PREPARATION FOR FUTURE RAINFALL.
5 6
10 13
LEGEND:11 12 DECANTING SHALL BE VIA A PUMP WITH FLOATING INLET SUCH THAT WATERS
14
ARE DRAWN FROM THE SURFACE TO MINIMISE RE-SUSPENSION OF
8 8
SEDIMENTS.
PROPOSED PIT PROTECTION - REFER DETAIL
SEDIMENT BASIN IS TO REMAIN IN PLACE UNTIL 70% GROUND COVER IS
ACHIEVED ON DISTURBED AREAS. THE BASIN MAY THEN BE BACKFILLED IN
PROPOSED INLET PIT PROTECTION - REFER DETAIL
300mm LAYERS, TOPSOILED AND GRASS SEEDED.
X X PROPOSED SILT FENCE (INCLUDING 2.0m SEDIMENT BASIN EMBANKMENT SHALL BE INPECTED BE THE SUPERVISING
WINGS AT 5.0m CENTRES) ENGINEER PRIOR TO PLACEMENT OF FILL.
6
CONSTRUCTION ENTRY/EXIT - REFER DETAIL
0 10 20 30 40.001 50.001
ROCK DAM @ 30m CTS.
REFER DETAIL DRG ES02 SCALE 1:500 (A1), 1:1000 (A3)
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 EROSION AND SEDIMENT CONTROL PLAN
FOR APPROVAL Date: AUG 2022 26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-24-ESC01 A 1 of
STEVEN HARRISON
Email: [email protected]
A 27/02/2025 ISSUE FOR APPROVAL PL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CALILE MALOUF INVESTMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6769-24-ESC01 ERORION AND SEDIMENT LAYOUT.dwg - DATE : 28/2/25 - 12:38pm - XREF's: X-BASE; X-SURVEY; X-SURVEY water; X-ARCH 3 ground; X-SURVEY retained trees; X-ARCH 1 basement; X-ARCH 2 lower ground; X-ARCH 4 level01; H-Approved-SH; H-Checked-SH Council Ref:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Civil Engineering plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.