EROSION & SEDIMENT CONTROL MANAGEMENT PLAN
Comply with all statutory regulations and maintain the during earthworks Refer Best Practice Erosion and
Objective / Target construction. Comply with the Major Erosion and Sediment Control Plan Sediment Control Manual - Section
by ALTA PROJECTS to control erosion and sediment flows. 5 checklist
Site foreman to identify and check direction of stormwater flows as
shown on plan. Provide barriers and other measures shown on plan and Utilise B.P.& S.C. Manual
Management Strategy
within council guidelines to prevent stormwater flows over Inspection Form Section 7 PROPOSED TEMPORARY SEDIMENT BASIN '1'
embankments and minimise sediments into gully pits. (TO BE CONSTRUCTED AS PART OF EARLY WORKS)
2x LAYERS BIDIM A24 TO BASE OF
LEVEL 0.6m
SEDIMENT
MAXIMUM
Implement and maintain control measures identified on the Erosion and Utilise Section 7 - B.P.& S.C. SEDIMENT BASIN. EXTENDING OVER RIC &
Task / Actions GABION WEIR. REPLACE TOP LAYER EACH
Sediment Control Plans. Manual checklist
TIME BASIN CLEANED OUT
Site foreman to check for erosion and sediment flows at the base of 1
Utilise Section 7 - B.P.& S.C. BASE RL 10.25
Performance Indicators embankments after rain. Check that all sediment fences and check 2 MAX
Manual checklist
dams are working correctly during rain events. 1
BASE RL 9.65
BIDIM A24 GEOFABRIC 2 MAX
PINNED TO BATTERS
Inspection of all control structures shall be undertaken prior to expected
rainfall events and at least twice weekly. All minor structures such as Refer drawing ESC01 for
Frequency / Deadline
windrows, sediment fences etc, shall be inspected at the completion of frequency
each day.
TEMPORARY SEDIMENT BASIN '1' SECTION
Responsible Person / The implementation of the Major Erosion and Sediment Control Plan is Refer Erosion and Sediment SCALE 1:20
Organisation the responsibility of the Principal Contractor. Control Plan Section 6.0 BASIN TO BE CLEANED OUT
PRIOR TO MAXIMUM SEDIMENT
LEVEL BEING REACHED
Principal contractor to provide a monthly copy of record sheets
Refer Erosion and Sediment SILT FENCE BY LENGTH AS REQUIRED
Reporting / Review identifying test results for water quality testing. Site workman to advise SEDIMENT FENCE
Control Plan Section 6.0
MAX.
GEOFABRICS
700
foreman if they notice any barrier needing repair. BY GEOFABRICS
"BIDIM A34" BY GEOFABRICS OR APROVED
EQUIVALENT. INSTALLED AS SHOWN
N.S.L. N.S.L.
N.S.L.
Should inspection reveal deficiencies, the Contractor shall report issues NCR form to be utilised refer 200 MIN
Corrective Actions 200 MIN
to Supervising Engineer. Section 7 - B.P.& S.C. Manual GRATED INLET
PIT IN ROADWAY POSTS AT 3m CENTRES WITH WIRE
SECTION MESH BACKING or 2m WITHOUT. ALL
POSTS DRIVEN 600mm INTO GROUND.
ELEVATION PLAN
NOTE: A SAFE STORAGE LOCATION FOR FUELS AND OILS SHALL BE PROVIDED IN ACCORDANCE WITH AS1940 “THE STORAGE
AND HANDLING OF COMBUSTIBLE LIQUIDS”. THIS AREA SHALL BE BUNDED IN COMPLIANCE WITH THE STANDARD AND RELEVANT PERIMETER SILT FENCE
REQUIREMENTS OF AUTHORITIES. ALLOTMENT PIT PROTECTION DETAIL SCALE 1:50
SCALE 1:20
SEDIMENT FENCES SHALL BE CONSTRUCTED WITH RETURNS AT
INTERVALS IN ACCORDANCE WITH "IECA BEST PRACTICE EROSION
CONTROL MANUAL" AND MAXIMUM 20m SPACINGS FOR FENCES
ALONG CONTOURS AND 10m FOR ON-GRADE.
TYPICAL LIP-IN-LINE
GULLY PIT
Construction Site ROCK CHECK DAMS SHALL BE LOCATED IN ALL CUT OFF DRAINS IN
5m Cattle grid 3.0m NOM width ACCORDANCE WITH IEAC STANDARD DRAWING RCD -01
NOTE: AFTER EACH RAINFALL EVENT THE SEDIMENT BASIN MUST BE MIN
NOM
set 300mm above ground
100
FLOCCULATED, TO ACHIEVE A MAXIMUM TOTAL SS OF 50MG/L, AND PUMPED
DOWN TO THE START OF THE SETTLING ZONE. ADEQUATE TESTING MUST BE FORM U-SHAPED CREST TO
UNDERTAKEN, WITH RECORDS OF TESTING RETAINED, DEMONSTRATING 10 NOTE: ENSURE OVER TOPPING AT
PROVIDE GEOTEXTILE MIN m 600mm CENTRE OF DAM
COMPLIANCE TO THE REQUIRED WATER QUALITY RELEASE PARAMETERS. FABRIC WRAP OVER GRATE Contractor to provide a wash
KERB & CHANNEL down facilty in conjunction 150mm MIN
300
Geotextile fabric, 2
STANDARD DRAWINGS Bidum U34 or similar with the proposed cattle grid.
DIRECTION OF FLOW
1
0.3m-0.5m
BEST PRACTICE EROSION AND SEDIMENT CONTROL BOOK 6 - STANDARD GEOTEXTILE TUBE 3 m IN
M T oE
DRAWINGS IS TO BE REFERRED TO DURING CONSTRUCTION. PROVIDE SAND FILLED 100Ø xte 150mm ROCK SPALLS EMBED 200mm
75 - 100mm rna INTO GROUND
SLOTTED AG DRAIN, lR GEOTEXTILE
CRUSHED ROCK oad
WRAPPED IN GEOFABRIC, or FABRIC
WATER QUALITY OBJECTIVES APPROVED EQUIVALENT, ROCK CHECK DAM
DISSOLVED OXYGEN (%) 80-100% TO FRONT OF CHAMBER
pH 6.5 TO 8.0 CONSTRUCTION EXIT SCALE 1:50
SUSPENDED SOLIDS (mg/L) <50 INLET PIT PROTECTION DETAIL (IP)
TURBIDITY (NTU) <50 SCALE 1:20
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 EROSION AND SEDIMENT CONTROL DETAILS
FOR APPROVAL Date: AUG 2022 26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-24-ESC02 A 2 of
STEVEN HARRISON
Email: [email protected]
A 27/02/2025 ISSUE FOR APPROVAL PL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CALILE MALOUF INVESTMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6769-24-ESC02 ERORION AND SEDIMENT DETAILS.dwg - DATE : 28/2/25 - 12:36pm - XREF's: H-Approved-SH; H-Checked-SH Council Ref:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Civil Engineering plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 26.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.