Original source · versioned page text
2014-10-14 Planning & Organisation Committee Agenda - Pages 1 - 50
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 14 OCTOBER 2014
ATTACHMENT 1
Page 16 of 117
ATTACHMENT 1
a) Hydrology & Water
Meanogemer Corsulling
a
* wae
ioe —_—— in Ja al 0 15 30 45 (m)
\ as es — el
1:1500 (3)
he el
any
4, on] as
ty | Legend
si CJ DCDB
a — —
>
[— upgraded Cuners
rt
od Flow Velocity Vector
a
=.
7 >
oe
IG TE ~— Sit}
ie , —_— A hy a iid
&)
Les
- es My 020
_ 1S te020
te. 1S
| OS t20 10
O04 t20.06
bl if 0.08 15-004
12-0.08
0.18 ts -D.
O2613-0.
020
WB wee cry. tow Wat
ee Wee Wet How Ory
——
we
* !
{@)
<=
—
*.
a
Hydraulic Assessment of the
Garnet Street Culvert Upgrade
7) ce Peak Flood Level impacts
39% AEP Design Event (DIS)
(2 year
oa Y LT i bn 20% Culvert Blockage
(Case DO6f Vs BO2e)
cal Client: Peet Limited
biel ter Th oe
Page 16 of 117See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.