Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2014-10-14 Planning & Organisation Committee Agenda - Pages 1 - 50

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        14 OCTOBER 2014


Fee Description                                                               2014/15        2014/15
                                                                              Current Fee    Proposed Fee
Domestic Self Haul (Incl GST)

Domestic Waste Small - up to an average sedan boot or half of a small         $7.50          $7.00
trailer, approximately 0.5 m3.
Domestic Waste Medium - up to approximately 1 m3. This may be a full          $22.00         $20.50
normal sized trailer body (up to approx. 2m x 1m x 0.5m or 7’ x 4’) or a
full similar size utility tray
Domestic Waste Large - any volume larger than 1 m3 but less than              $37.00         $34.00
500kg. This includes box trailers, full vans and full utes with trailers.
Domestic Waste (pro rata per m3) - any vehicle / waste load not               $90.00         $85.00
described above
Domestic Waste (pro rata per tonne) - any vehicle / waste load not            $145.00        $137.00
described above
Dead Animals Small - Generally less than 25 kgs                               $4.00          $3.50
Dead Animals Medium - Generally weighing between 26-100 kgs                   $13.00         $12.00
Dead Animals Large - Generally weighing over 101 kgs (includes site           $74.00         $72.50
preparation)
Commercial Self Haul (Incl GST)

Commercial Waste Small - up to an average sedan boot or half of a             $7.50          $7.00
small trailer, approximately 0.5 m3.
Commercial Waste Medium - up to approximately 1 m3. This may be a             $22.00         $20.50
full normal sized trailer body (up to approx. 2m x 1m x 0.5m or 7’ x 4’) or
a full similar size utility tray
Commercial Waste Large - any volume larger than 1 m3 but less than            $37.00         $34.00
500kg. This includes box trailers, full vans and full utes with trailers.
Commercial Waste (pro rata per m3) - any vehicle / waste load not             $90.00         $85.00
described above
Commercial Waste (pro rata per tonne) - any vehicle / waste load not          $145.00        $137.00
described above
Construction and Demolition Waste Small - up to an average sedan              $7.50          $7.00
boot or half of a small trailer, approximately 0.5 m3.
Construction and Demolition Waste Medium - up to approximately 1 m3.          $20.90         $19.50
This may be a full normal sized trailer body (up to approx. 2m x 1m x
0.5m or 7’ x 4’) or a full similar size utility tray
Construction and Demolition Waste Large - any volume larger than 1            $33.00         $30.00
m3 but less than 500kg. This includes box trailers, full vans and full utes
with trailers.
Construction and Demolition Waste (pro rata per tonne) - any vehicle /        $90.00         $85.00
waste load not described above
Construction and Demolition Waste (pro rata per m3) - any vehicle /           $145.00        $137.00
waste load not described above
Construction and Demolition Waste (pro rata per tonne) - any vehicle /        $145.00        $137.00
waste load not described above
Construction and Demolition Waste (pro rata per m3) - any vehicle /           $90.00         $85.00
waste load not described above
Limited Regulated, Contaminated or Special Waste (pro rata per tonne /        $180.00        $172.00
m3) e.g. asbestos, contaminated soil
Waste Services - Temporary cleansing services - Extra litres pumped           $0.01          $0.0125
from holding tanks (>5000 litres) charge per litre




                                                                                            Page 40 of 117
Log in to download the original file

2014-10-14 Planning & Organisation Committee Agenda - Pages 1 - 50(PDF, 4MB).pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.