Decision Notice - Change to an Existing Approval - 010.2005.00001189.005 [As Published] · 132005.1189.05

of 19

Text shows just the words. Original shows the document exactly as it was published.

                                                                                        2005/1189

45.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
      (minimum storage 3000 litres per dwelling unit) that is plumbed to service the toilets in the new
      dwelling and landscaping areas. The design of the rainwater storage system shall be to the
      satisfaction of the Manager Plumbing Services.
46.   As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed
      within the site to collect and discharge stormwater runoff from all adjoining properties to
      prevent additional ponding/flooding on these properties.
47.   Drainage of the site shall be in accordance with the principles of Council’s - Noosaville Master
      Drainage Plan to ensure that the site discharges to the appropriate drainage catchments. This
      information can be obtained from Council’s Technical Officer - Development, by contacting
      5449 5263.
48.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to
      being permitted to discharge into Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.
      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.
      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
49.   All site stormwater drainage shall be by means of a gravity system.
50.   All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
      circuit television (CCTV) prior to commencement of the approved Use.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
      following satisfactory completion of construction works. The developer will be responsible for
      the full cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification. This charge is payable prior to the issue of Operational Works
      approval and will be determined on the unit rate basis current at the time of approval.
Stormwater Drainage Contributions
51.   A contribution of $16,176 shall be paid to Council towards the cost of the Noosaville Master
      Drainage Plan prior to obtaining a Development Permit for Operational Works. The amount of
      the contribution shall be adjusted in line with changes to the Consumer Price Index, All Groups
      Brisbane from December 2005 until the date of payment.
Sewer Mains
52.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
53.   Sewer relocation works shall be in accordance with Construction Hydraulics Drawings 1470-S-
      1 and 1470-O-2 and Noosa Shire Council Planning Scheme Policy 6, Engineering Design
      Standards, Water & Sewerage.
54.   Sewer relocation works are to be completed prior to the commencement of any buildings
      works on the site.
                                                                                      Page 8 of 19

Used in these records

About this file

File size
97 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2005.00001189.005 [As Published].pdf · 97 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.