SUPERSEDED Minor Change Existing Approval - 51983.3225.23 (As Published)

of 23

Text shows just the words. Original shows the document exactly as it was published.

               18.    The development site must be landscaped generally in accordance with Planning Scheme
                      Policy PSP03 – Landscaping Plants and guidelines and the following requirements:
                      a.      Lot 17 - 2 x 45L Small Leaf Lilly Pilly’s (Syzygium luehmannii) planted in the general
                              location of the vegetation approved for removal.
                      b.      Lot 17-3 x 45L trees listed in the PSP03 suitable for the Noosa Heads locality must be
                              planted between the building and the northern boundary and northwestern corner of
                              Lot 17 that grow to a maximum height of 7 metres.
                      c.      Lot 19 - the works as generally shown on the approved Landscape concept plan as
                              prepared by Louise Custance except for the usage of exotic species and include 2
                              advanced local native tree species in a pot size of no less than 45L that grow to a
                              maximum height of 7 metres.
                      d.      Lot 19 – Landscaping must be provided between the building and western boundary
                              that grow (on average) to a maximum height of 5 metres in order to soften the built
                              form where viewed from the west.
               19.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               20.    Landscape works must be completed prior to the commencement of the approval use.
               21.    Vegetation to be retained must be protected from clearing or construction activities by:
                      a.      clearly marking vegetation to be retained with flagging tape
                      b.      installing protective fencing around the drip line of the vegetation
                      c.      restricting stockpiling, storage and vehicle parking to those areas which are already
                              cleared
                      d.      using low impact construction techniques around vegetation.
                      Damage to Services and Assets
               22.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Flood
               23.    In response to the potential flood risks, material and surface treatments below the defined
                      flood event must be resilient to water damage and do not include wall cavities that are
                      susceptible to the intrusion of water.
               24.    No habitable rooms are to be located on the ground floor.
                      Demolition
               25.    Security to the value of $5,000 must be provided to Council’s Building and Plumbing Services
                      prior to the issue of the Development Approval for Building Works – demolition of Unit 17 &
                      19. The security must be in the form of a cash bond or bank guarantee, for security against
                      satisfactory completion of works.
               26.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways at the removal site, the new site or between the sites must be repaired
                      or reinstated to at least pre-existing conditions.



                                                                                                     Page 13 of 23
Document Set ID: 24114935
Version: 6, Version Date: 19/09/2025

Used in these records

About this file

File size
220 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Minor Change Existing Approval - 51983.3225.23 (As Published).pdf · 220 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.